2016-01-28 Tools Workgroup
Date: January 28, 2016
Time: 2-3:30pm MST
Call in: 1-800-768-2983 and access code 4918837
Webinar: https://join.me/IWDW-Online
IWDW Tools Workgroup
Contents [hide]
Links
Tools wiki Meeting minutes and agendasTools workgroup forum IWDW Forum topic on tool development
Current tools
The Data page on the IWDW website provides links to the tools:- Emissions Review
- Source Apportionment
- Model-to-Observation Comparison
- Model Performance Evaluation Plots
- Summary Reports
Development tools
- Emissions GIS
Agenda
- Review minutes from December Tools workgroup call
- Status of current tools
- Emissions GIS demo (see links above)
- Comments on UI
- Comments on display products
- Relevant GIS layers
- APCD
- EPA Greenbook
- O&G activity
- Additional spatial analysis to include in display (e.g. wells per county, etc.)
- Outcomes
- IWDW tool development
- Priorities - MPE x IWDW matrix.docx; plot examples
- Update on model-to-obs tool
- Outcomes
- Other items
- Next call
Minutes
Attendees
Gail T., Kevin B., Rebecca M., Ken R., Patrick B., Mark J., Zac A., Shawn M, Dustin S. Rodger A.Overview
Rodger reviewed minutes from the previous Tools Workgroup call, then walked the group through the IWDW tools document and updated the group on the current status of IWDW visualization and MPE tools.GIS demos
Dustin gave a demo of two new emissions GIS prototype tools. Feedback from the group included adding a source category dropbox to the county level spatial emissions tool. This would allow the tool to display pollutant emissions for user selected major source categories.Alignment of IWDW displays with EPA's MPE Checklist
Rebecca provided the group with a document that summarizes the graphical products in the MPE checklist document. This is similar to the MPExIWDW table Rodger presented to the group during the previous call. The intent of these lists is to locate MPE products specified in the checklist that already exist on the IWDW, and further to identify MPE products that are not available on the IWDW and possibly prioritize these graphics for future development. The consensus of the group was to complete the MPE "alignment" process, then solicit feedback from the tools workgroup on IWDW tool development prioritization. Further development work on prototype tools, such as the emissions GIS tools, should be postponed until the group is able to prioritize tool development on all MPE categories outlined in the checklist, including emissions and PGM results.MPE checklist graphical products document
Action Items
- Rodger will work with Zac and Rebecca to locate MPE checklist graphics on the IWDW