Site Details |
| Country: | United States |
| State: | California (pop. 29760021) |
| County: | San Bernardino County (pop. 1418380) |
| Location2: | Converse Fire Station, Seven Oaks, CA, S. of Big Bear Lake |
| Latitude: | 34.1939 |
| Longitude: | -116.9132 |
| Elevation: | 1726m above MSL |
| EPA Code: | 060719010 |
| Agency: | US Forest Service |
| Sponsor: | USFS |
| Region: | Southern California |
| Land Use: | Unknown |
| AQCR: | None |
| Dates: | 3/1988 - Present |
| SiteID: | 99 |
| SiteCode: | SAGO1 |
| SiteName: | San Gorgonio Wilderness |
| Maps: | Google, MSN, Yahoo |
Site History |
| 12/25/1996: | offline until 01/29/1997 |
| 11/29/1996: | D1 Module Flow Calibration |
| 11/17/2003: | D1 Module electronics box replaced |
| 10/17/2000: | A1 Module electronics box replaced |
| 10/11/1995: | Smoke from Bluff fire in Riverside county drifting in area |
| 10/01/1998: | A1 Module pump replaced |
| 10/01/1998: | B1 Module pump replaced |
| 10/01/1998: | C1 Module pump replaced |
| 10/01/1998: | D1 Module pump replaced |
| 10/01/1998: | Surge protector installed |
| 09/20/2000: | A1 Module Flow Calibration |
| 09/20/2000: | B1 Module Flow Calibration |
| 09/20/2000: | C1 Module Flow Calibration |
| 09/20/2000: | D1 Module Flow Calibration |
| 09/16/2004: | D1 Module denuder replaced |
| 09/14/2004: | A1 Module Flow Calibration |
| 09/14/2004: | B1 Module Flow Calibration |
| 09/14/2004: | C1 Module Flow Calibration |
| 09/14/2004: | D1 Module Flow Calibration |
| 09/14/2004: | Routine annual maintenance |
| 09/10/2002: | A1 Module Flow Calibration |
| 09/10/2002: | B1 Module Flow Calibration |
| 09/10/2002: | C1 Module Flow Calibration |
| 09/10/2002: | D1 Module Flow Calibration |
| 09/10/2002: | Routine annual maintenance |
| 09/01/1998: | A1 Module Flow Calibration |
| 09/01/1998: | B1 Module Flow Calibration |
| 09/01/1998: | C1 Module Flow Calibration |
| 09/01/1998: | D1 Module Flow Calibration |
| 09/01/1998: | Routine annual maintenance |
| 08/20/2000: | Version 2 IMPROVE sampler installed |
| 08/18/1999: | several large fires in area |
| 08/08/1994: | A1 Module Flow Calibration |
| 08/08/1994: | B1 Module Flow Calibration |
| 08/08/1994: | C1 Module Flow Calibration |
| 08/08/1994: | D1 Module Flow Calibration |
| 08/08/1994: | Routine annual maintenance |
| 08/07/2000: | A1 Module Flow Calibration |
| 08/07/2000: | B1 Module Flow Calibration |
| 08/07/2000: | C1 Module Flow Calibration |
| 08/07/2000: | D1 Module Flow Calibration |
| 08/07/2000: | Version 2 sampler installed |
| 08/06/2003: | A1 Module Flow Calibration |
| 08/06/2003: | B1 Module Flow Calibration |
| 08/06/2003: | C1 Module Flow Calibration |
| 08/06/2003: | D1 Module Flow Calibration |
| 08/06/2003: | Photos taken |
| 08/06/2003: | Routine annual maintenance |
| 08/06/2003: | Site moved 600 feet W |
| 07/31/1997: | A1 Module Flow Calibration |
| 07/31/1997: | B1 Module Flow Calibration |
| 07/31/1997: | C1 Module Flow Calibration |
| 07/31/1997: | D1 Module Flow Calibration |
| 07/31/1997: | Routine annual maintenance |
| 06/28/1994: | Changed nylon filter size from 47mm diameter to 25mm |
| 06/07/1995: | Prescribed fire 13 miles W of station, winds going west |
| 05/29/2002: | D1 Module pump replaced |
| 05/22/1999: | moderate to heavy smoke in area |
| 05/21/1997: | Prescribed fire 3 miles west of site |
| 05/16/1995: | A1 Module Flow Calibration |
| 05/16/1995: | B1 Module Flow Calibration |
| 05/16/1995: | B1 Module solenoid replaced |
| 05/16/1995: | C1 Module Flow Calibration |
| 05/16/1995: | D1 Module Flow Calibration |
| 05/16/1995: | D1 Module pump replaced |
| 05/16/1995: | Routine annual maintenance |
| 05/03/2000: | Prescribed fire of 100 acres west of site |
| 04/22/1995: | A1 Module area increased from 2.20 to 3.53 sq cm |
| 04/12/2005: | A1 Module pump replaced |
| 04/12/2005: | B1 Module pump replaced |
| 04/07/1996: | B1 Module pump replaced |
| 04/07/1996: | C1 Module pump replaced |
| 04/05/2003: | Routine annual maintenance |
| 04/05/2003: | A1 Module Flow Calibration |
| 04/05/2003: | B1 Module Flow Calibration |
| 04/05/2003: | C1 Module Flow Calibration |
| 04/05/2003: | D1 Module Flow Calibration |
| 04/02/1996: | A1 Module Flow Calibration |
| 04/02/1996: | Added glycerin to Module B1 denuder |
| 04/02/1996: | B1 Module Flow Calibration |
| 04/02/1996: | C1 Module Flow Calibration |
| 04/02/1996: | D1 Module Flow Calibration |
| 04/02/1996: | Routine annual maintenance |
| 03/31/1999: | Prescribed fire a few miles away |
| 03/27/1996: | Prescribed fire this week |
| 03/26/2005: | A1 Module Flow Calibration |
| 03/26/2005: | B1 Module Flow Calibration |
| 03/26/2005: | C1 Module Flow Calibration |
| 03/26/2005: | D1 Module Flow Calibration |
| 03/26/2005: | Routine annual maintenance |
| 02/15/1999: | D1 Module Flow Calibration |
| 02/09/1995: | A1 Module Flow Calibration |
| 02/09/1995: | B1 Module Flow Calibration |
| 02/09/1995: | C1 Module Flow Calibration |
| 02/09/1995: | D1 Module Flow Calibration |
| 01/24/2000: | C1 Module pump replaced |
| 01/11/2005: | Sampler removed collocated PM10 |
| 01/05/2004: | A1 Module pump replaced |