San Gorgonio Wilderness (SAGO1)
Site Details
Country:United States
State:California (pop. 29760021)
County:San Bernardino County (pop. 1418380)
Location2:Converse Fire Station, Seven Oaks, CA, S. of Big Bear Lake
Latitude:34.1939
Longitude:-116.9132
Elevation:1726m above MSL
EPA Code:060719010
Agency:US Forest Service
Sponsor:USFS
Region:Southern California
Land Use:Unknown
AQCR:None
Dates:3/1988 - Present
SiteID:99
SiteCode:SAGO1
SiteName:San Gorgonio Wilderness
Maps:Google, MSN, Yahoo
Site History
12/25/1996:offline until 01/29/1997
11/29/1996:D1 Module Flow Calibration
11/17/2003:D1 Module electronics box replaced
10/17/2000:A1 Module electronics box replaced
10/11/1995:Smoke from Bluff fire in Riverside county drifting in area
10/01/1998:A1 Module pump replaced
10/01/1998:B1 Module pump replaced
10/01/1998:C1 Module pump replaced
10/01/1998:D1 Module pump replaced
10/01/1998:Surge protector installed
09/20/2000:A1 Module Flow Calibration
09/20/2000:B1 Module Flow Calibration
09/20/2000:C1 Module Flow Calibration
09/20/2000:D1 Module Flow Calibration
09/16/2004:D1 Module denuder replaced
09/14/2004:A1 Module Flow Calibration
09/14/2004:B1 Module Flow Calibration
09/14/2004:C1 Module Flow Calibration
09/14/2004:D1 Module Flow Calibration
09/14/2004:Routine annual maintenance
09/10/2002:A1 Module Flow Calibration
09/10/2002:B1 Module Flow Calibration
09/10/2002:C1 Module Flow Calibration
09/10/2002:D1 Module Flow Calibration
09/10/2002:Routine annual maintenance
09/01/1998:A1 Module Flow Calibration
09/01/1998:B1 Module Flow Calibration
09/01/1998:C1 Module Flow Calibration
09/01/1998:D1 Module Flow Calibration
09/01/1998:Routine annual maintenance
08/20/2000:Version 2 IMPROVE sampler installed
08/18/1999:several large fires in area
08/08/1994:A1 Module Flow Calibration
08/08/1994:B1 Module Flow Calibration
08/08/1994:C1 Module Flow Calibration
08/08/1994:D1 Module Flow Calibration
08/08/1994:Routine annual maintenance
08/07/2000:A1 Module Flow Calibration
08/07/2000:B1 Module Flow Calibration
08/07/2000:C1 Module Flow Calibration
08/07/2000:D1 Module Flow Calibration
08/07/2000:Version 2 sampler installed
08/06/2003:A1 Module Flow Calibration
08/06/2003:B1 Module Flow Calibration
08/06/2003:C1 Module Flow Calibration
08/06/2003:D1 Module Flow Calibration
08/06/2003:Photos taken
08/06/2003:Routine annual maintenance
08/06/2003:Site moved 600 feet W
07/31/1997:A1 Module Flow Calibration
07/31/1997:B1 Module Flow Calibration
07/31/1997:C1 Module Flow Calibration
07/31/1997:D1 Module Flow Calibration
07/31/1997:Routine annual maintenance
06/28/1994:Changed nylon filter size from 47mm diameter to 25mm
06/07/1995:Prescribed fire 13 miles W of station, winds going west
05/29/2002:D1 Module pump replaced
05/22/1999:moderate to heavy smoke in area
05/21/1997:Prescribed fire 3 miles west of site
05/16/1995:A1 Module Flow Calibration
05/16/1995:B1 Module Flow Calibration
05/16/1995:B1 Module solenoid replaced
05/16/1995:C1 Module Flow Calibration
05/16/1995:D1 Module Flow Calibration
05/16/1995:D1 Module pump replaced
05/16/1995:Routine annual maintenance
05/03/2000:Prescribed fire of 100 acres west of site
04/22/1995:A1 Module area increased from 2.20 to 3.53 sq cm
04/12/2005:A1 Module pump replaced
04/12/2005:B1 Module pump replaced
04/07/1996:B1 Module pump replaced
04/07/1996:C1 Module pump replaced
04/05/2003:Routine annual maintenance
04/05/2003:A1 Module Flow Calibration
04/05/2003:B1 Module Flow Calibration
04/05/2003:C1 Module Flow Calibration
04/05/2003:D1 Module Flow Calibration
04/02/1996:A1 Module Flow Calibration
04/02/1996:Added glycerin to Module B1 denuder
04/02/1996:B1 Module Flow Calibration
04/02/1996:C1 Module Flow Calibration
04/02/1996:D1 Module Flow Calibration
04/02/1996:Routine annual maintenance
03/31/1999:Prescribed fire a few miles away
03/27/1996:Prescribed fire this week
03/26/2005:A1 Module Flow Calibration
03/26/2005:B1 Module Flow Calibration
03/26/2005:C1 Module Flow Calibration
03/26/2005:D1 Module Flow Calibration
03/26/2005:Routine annual maintenance
02/15/1999:D1 Module Flow Calibration
02/09/1995:A1 Module Flow Calibration
02/09/1995:B1 Module Flow Calibration
02/09/1995:C1 Module Flow Calibration
02/09/1995:D1 Module Flow Calibration
01/24/2000:C1 Module pump replaced
01/11/2005:Sampler removed collocated PM10
01/05/2004:A1 Module pump replaced