Hoover (HOOV1)
Site Details
Country:United States
State:California (pop. 29760021)
County:Mono County (pop. 9956)
Latitude:38.0881
Longitude:-119.1771
Elevation:2560m above MSL
EPA Code:060519000
Agency:US Forest Service
Sponsor:USFS
Region:Sierra Nevadas
Land Use:Unknown
AQCR:None
Dates:7/2001 - Present
SiteID:97
SiteCode:HOOV1
SiteName:Hoover
Maps:Google, MSN, Yahoo
Site History
11/01/2001:Sampler controller replaced
10/20/2002:Smoke in Mono Basin from fire in Yosemite
10/15/2004:Smoke in the area all day
10/14/2003:D1 Module pump replaced
10/02/2004:B1 Module valve replaced
09/15/2004:A1 Module Flow Calibration
09/15/2004:B1 Module Flow Calibration
09/15/2004:C1 Module Flow Calibration
09/15/2004:Calibrated collocated C1 Module
09/15/2004:D1 Module Flow Calibration
09/15/2004:Photos taken
09/15/2004:Routine annual maintenance
09/12/2004:Fire in Yosemite smoke in Mono Basin
08/20/2003:D1 Module inlet replaced
08/17/2001:Fire in the area
08/13/2003:A1 Module Flow Calibration
08/13/2003:B1 Module Flow Calibration
08/13/2003:C1 Module Flow Calibration
08/13/2003:Calibrated collocated C1 Module
08/13/2003:D1 Module Flow Calibration
08/13/2003:Installed collocated C1 Module
08/13/2003:Photos taken
08/12/2003:C1 Module pump replaced
08/12/2003:D1 Module pump replaced
08/12/2003:Routine annual maintenance
08/12/2002:A1 Module Flow Calibration
08/12/2002:B1 Module Flow Calibration
08/12/2002:C1 Module electronics box replaced
08/12/2002:C1 Module Flow Calibration
08/12/2002:D1 Module Flow Calibration
08/12/2002:Routine annual maintenance
08/12/2002:Sampler controller replaced
08/12/2001:Fire in the area
07/01/2001:New IMPROVE site, version 2 sampler installed
06/13/2001:A1 Module Flow Calibration
06/13/2001:B1 Module Flow Calibration
06/13/2001:C1 Module Flow Calibration
06/13/2001:D1 Module Flow Calibration
06/13/2001:Photos taken
06/13/2001:Version 2 sampler installed
04/22/2002:Sampler controller replaced
04/16/2004:D1 Module pump replaced
03/23/2004:D1 Module pump replaced
03/04/2004:A1 Module area increased from 2.20 to 3.53 sq cm
01/10/2002:A1 Module Flow Calibration
01/10/2002:B1 Module Flow Calibration
01/10/2002:C1 Module Flow Calibration
01/10/2002:D1 Module Flow Calibration
01/10/2002:Routine annual maintenance