Yosemite NP (YOSE1)
Site Details
Country:United States
State:California (pop. 29760021)
County:Mariposa County (pop. 14302)
Location2:Turtleback Dome, 1 mi W of Tunnel View
Latitude:37.7133
Longitude:-119.7061
Elevation:1603m above MSL
EPA Code:060430003
Agency:National Park Service
Sponsor:NPS
Region:Sierra Nevadas
Land Use:Unknown
AQCR:None
Dates:3/1988 - Present
SiteID:96
SiteCode:YOSE1
SiteName:Yosemite NP
Maps:Google, MSN, Yahoo
Site History
11/26/1996:D1 Module Flow Calibration
11/09/2004:A1 Module electronics box replaced
11/09/2004:B1 Module electronics box replaced
11/09/2004:C1 Module electronics box replaced
11/09/2004:D1 Module electronics box replaced
11/09/2004:Sampler controller replaced
11/08/1996:Thermometer replaced
10/30/1998:A1 Module pump replaced
10/30/1998:A1 Module stack and inlet replaced
10/30/1998:B1 Module pump replaced
10/30/1998:C1 Module pump replaced
10/30/1998:Cyclones replaced
10/30/1998:D1 Module pump replaced
10/29/1998:A1 Module Flow Calibration
10/29/1998:B1 Module Flow Calibration
10/29/1998:C1 Module Flow Calibration
10/29/1998:D1 Module Flow Calibration
10/29/1998:Routine annual maintenance
10/25/1995:Very smoky last week fire near site in Yosemite valley
10/10/2004:Fire this week
09/14/2004:A1 Module Flow Calibration
09/14/2004:B1 Module Flow Calibration
09/14/2004:C1 Module Flow Calibration
09/14/2004:D1 Module Flow Calibration
09/14/2004:Photos taken
09/14/2004:Routine annual maintenance
09/12/1998:Prescribed fire ignited 9/14/98
09/09/1994:A1 Module Flow Calibration
09/09/1994:B1 Module Flow Calibration
09/09/1994:C1 Module Flow Calibration
09/09/1994:D1 Module Flow Calibration
08/27/2002:C1 Module Flow Calibration
08/24/2000:A1 Module Flow Calibration
08/24/2000:B1 Module Flow Calibration
08/24/2000:C1 Module Flow Calibration
08/24/2000:D1 Module Flow Calibration
08/23/2001:nearby fire, very smoky this week
08/13/2003:B1 Module Flow Calibration
08/13/2003:C1 Module Flow Calibration
08/13/2003:C1 Module pump replaced
08/13/2003:D1 Module Flow Calibration
08/13/2003:D1 Module pump replaced
08/13/2003:Photos taken
08/13/2003:Routine annual maintenance
08/13/2003:A1 Module Flow Calibration
08/11/1995:A1 Module Flow Calibration
08/11/1995:B1 Module Flow Calibration
08/11/1995:C1 Module Flow Calibration
08/11/1995:D1 Module Flow Calibration
08/11/1995:Routine annual maintenance
08/06/1997:A1 Module Flow Calibration
08/06/1997:B1 Module Flow Calibration
08/06/1997:C1 Module Flow Calibration
08/06/1997:D1 Module Flow Calibration
08/06/1997:Routine annual maintenance
08/03/2001:A1 Module Flow Calibration
08/03/2001:B1 Module Flow Calibration
08/03/2001:C1 Module Flow Calibration
08/03/2001:D1 Module Flow Calibration
08/03/2001:Photos taken
08/03/2001:Routine annual maintenance
07/17/2004:meadow fire heavy smoke next two weeks
07/14/2002:A1 Module Flow Calibration
07/14/2002:B1 Module Flow Calibration
07/14/2002:C1 Module Flow Calibration
07/14/2002:D1 Module Flow Calibration
07/14/2002:Routine annual maintenance
07/11/1996:A1 Module Flow Calibration
07/11/1996:Added glycerin to Module B1 denuder
07/11/1996:B1 Module Flow Calibration
07/11/1996:C1 Module Flow Calibration
07/11/1996:Routine annual maintenance
06/28/1994:Changed nylon filter size from 47mm diameter to 25mm
04/22/1998:Prescribed fire in park
03/07/2003:Sampler controller replaced
01/21/2000:A1 Module Flow Calibration
01/21/2000:B1 Module Flow Calibration
01/21/2000:C1 Module Flow Calibration
01/21/2000:D1 Module Flow Calibration
01/21/2000:Version 2 sampler installed
01/21/2000:Version 2 IMPROVE sampler installed
01/16/1998:Thermometer replaced
01/15/1997:Park still closed repairing roads
01/08/1997:High flood remediation continues this week
01/02/2002:A1 Module area increased from 2.20 to 3.53 sq cm
01/01/1997:High flood during this week