Site Details |
| Country: | United States |
| State: | California (pop. 29760021) |
| County: | Mariposa County (pop. 14302) |
| Location2: | Turtleback Dome, 1 mi W of Tunnel View |
| Latitude: | 37.7133 |
| Longitude: | -119.7061 |
| Elevation: | 1603m above MSL |
| EPA Code: | 060430003 |
| Agency: | National Park Service |
| Sponsor: | NPS |
| Region: | Sierra Nevadas |
| Land Use: | Unknown |
| AQCR: | None |
| Dates: | 3/1988 - Present |
| SiteID: | 96 |
| SiteCode: | YOSE1 |
| SiteName: | Yosemite NP |
| Maps: | Google, MSN, Yahoo |
Site History |
| 11/26/1996: | D1 Module Flow Calibration |
| 11/09/2004: | A1 Module electronics box replaced |
| 11/09/2004: | B1 Module electronics box replaced |
| 11/09/2004: | C1 Module electronics box replaced |
| 11/09/2004: | D1 Module electronics box replaced |
| 11/09/2004: | Sampler controller replaced |
| 11/08/1996: | Thermometer replaced |
| 10/30/1998: | A1 Module pump replaced |
| 10/30/1998: | A1 Module stack and inlet replaced |
| 10/30/1998: | B1 Module pump replaced |
| 10/30/1998: | C1 Module pump replaced |
| 10/30/1998: | Cyclones replaced |
| 10/30/1998: | D1 Module pump replaced |
| 10/29/1998: | A1 Module Flow Calibration |
| 10/29/1998: | B1 Module Flow Calibration |
| 10/29/1998: | C1 Module Flow Calibration |
| 10/29/1998: | D1 Module Flow Calibration |
| 10/29/1998: | Routine annual maintenance |
| 10/25/1995: | Very smoky last week fire near site in Yosemite valley |
| 10/10/2004: | Fire this week |
| 09/14/2004: | A1 Module Flow Calibration |
| 09/14/2004: | B1 Module Flow Calibration |
| 09/14/2004: | C1 Module Flow Calibration |
| 09/14/2004: | D1 Module Flow Calibration |
| 09/14/2004: | Photos taken |
| 09/14/2004: | Routine annual maintenance |
| 09/12/1998: | Prescribed fire ignited 9/14/98 |
| 09/09/1994: | A1 Module Flow Calibration |
| 09/09/1994: | B1 Module Flow Calibration |
| 09/09/1994: | C1 Module Flow Calibration |
| 09/09/1994: | D1 Module Flow Calibration |
| 08/27/2002: | C1 Module Flow Calibration |
| 08/24/2000: | A1 Module Flow Calibration |
| 08/24/2000: | B1 Module Flow Calibration |
| 08/24/2000: | C1 Module Flow Calibration |
| 08/24/2000: | D1 Module Flow Calibration |
| 08/23/2001: | nearby fire, very smoky this week |
| 08/13/2003: | B1 Module Flow Calibration |
| 08/13/2003: | C1 Module Flow Calibration |
| 08/13/2003: | C1 Module pump replaced |
| 08/13/2003: | D1 Module Flow Calibration |
| 08/13/2003: | D1 Module pump replaced |
| 08/13/2003: | Photos taken |
| 08/13/2003: | Routine annual maintenance |
| 08/13/2003: | A1 Module Flow Calibration |
| 08/11/1995: | A1 Module Flow Calibration |
| 08/11/1995: | B1 Module Flow Calibration |
| 08/11/1995: | C1 Module Flow Calibration |
| 08/11/1995: | D1 Module Flow Calibration |
| 08/11/1995: | Routine annual maintenance |
| 08/06/1997: | A1 Module Flow Calibration |
| 08/06/1997: | B1 Module Flow Calibration |
| 08/06/1997: | C1 Module Flow Calibration |
| 08/06/1997: | D1 Module Flow Calibration |
| 08/06/1997: | Routine annual maintenance |
| 08/03/2001: | A1 Module Flow Calibration |
| 08/03/2001: | B1 Module Flow Calibration |
| 08/03/2001: | C1 Module Flow Calibration |
| 08/03/2001: | D1 Module Flow Calibration |
| 08/03/2001: | Photos taken |
| 08/03/2001: | Routine annual maintenance |
| 07/17/2004: | meadow fire heavy smoke next two weeks |
| 07/14/2002: | A1 Module Flow Calibration |
| 07/14/2002: | B1 Module Flow Calibration |
| 07/14/2002: | C1 Module Flow Calibration |
| 07/14/2002: | D1 Module Flow Calibration |
| 07/14/2002: | Routine annual maintenance |
| 07/11/1996: | A1 Module Flow Calibration |
| 07/11/1996: | Added glycerin to Module B1 denuder |
| 07/11/1996: | B1 Module Flow Calibration |
| 07/11/1996: | C1 Module Flow Calibration |
| 07/11/1996: | Routine annual maintenance |
| 06/28/1994: | Changed nylon filter size from 47mm diameter to 25mm |
| 04/22/1998: | Prescribed fire in park |
| 03/07/2003: | Sampler controller replaced |
| 01/21/2000: | A1 Module Flow Calibration |
| 01/21/2000: | B1 Module Flow Calibration |
| 01/21/2000: | C1 Module Flow Calibration |
| 01/21/2000: | D1 Module Flow Calibration |
| 01/21/2000: | Version 2 sampler installed |
| 01/21/2000: | Version 2 IMPROVE sampler installed |
| 01/16/1998: | Thermometer replaced |
| 01/15/1997: | Park still closed repairing roads |
| 01/08/1997: | High flood remediation continues this week |
| 01/02/2002: | A1 Module area increased from 2.20 to 3.53 sq cm |
| 01/01/1997: | High flood during this week |