Bliss SP (TRPA) (BLIS1)
Site Details
Country:United States
State:California (pop. 29760021)
County:El Dorado County (pop. 125995)
Location2:Above SW shore of Lake Tahoe, CA,1/4 mile beyond headquarters on the service road
Latitude:38.9761
Longitude:-120.1025
Elevation:2130m above MSL
EPA Code:060179000
Agency:US Forest Service
Sponsor:USFS
Region:Oregon and Northern California
Land Use:Unknown
AQCR:None
Dates:11/1990 - Present
SiteID:95
SiteCode:BLIS1
SiteName:Bliss SP (TRPA)
Maps:Google, MSN, Yahoo
Site History
12/31/2003:C1 Module pump replaced
12/08/1995:A1 Module Flow Calibration
12/08/1995:B1 Module Flow Calibration
12/08/1995:C1 Module Flow Calibration
12/08/1995:D1 Module Flow Calibration
12/08/1995:Routine annual maintenance
12/04/1999:Site turned on
12/03/1999:A1 Module Flow Calibration
12/03/1999:B1 Module Flow Calibration
12/03/1999:C1 Module Flow Calibration
11/19/1999:Version 2 IMPROVE sampler installed
11/19/1999:A1 Module Flow Calibration
11/19/1999:B1 Module Flow Calibration
11/19/1999:C1 Module Flow Calibration
11/19/1999:D1 Module Flow Calibration
11/12/1997:Prescribed fire nearby.
11/08/2003:A1 Module Flow Calibration
11/08/2003:A1 Module pump replaced
11/08/2003:B1 Module Flow Calibration
11/08/2003:B1 Module pump replaced
11/08/2003:C1 Module Flow Calibration
11/08/2003:D1 Module Flow Calibration
11/08/2003:Photos taken
11/08/2003:Routine annual maintenance
11/08/1995:Prescribed fire
11/01/1995:Prescribed fire
10/29/1997:Prescribed fire nearby.
10/28/2001:smoke from Stanislaus fire
10/26/2002:A1 Module Flow Calibration
10/26/2002:A1 Module pumps replaced
10/26/2002:B1 Module Flow Calibration
10/26/2002:B1 Module pumps replaced
10/26/2002:C1 Module Flow Calibration
10/26/2002:D1 Module Flow Calibration
10/26/2002:Photos taken
10/26/2002:Routine annual maintenance
10/25/1995:Prescribed fire
10/22/1997:Prescribed fire nearby.
10/18/1995:Prescribed fire
10/15/1997:Prescribed fire nearby.
10/10/2000:A1 Module Flow Calibration
10/10/2000:B1 Module Flow Calibration
10/10/2000:C1 Module Flow Calibration
10/10/2000:D1 Module Flow Calibration
10/10/2000:Photos taken
10/10/2000:Routine annual maintenance
10/01/1997:Prescribed fire nearby.
09/24/2003:smoky all week due to fire
09/23/1996:D1 Module pump replaced
09/23/1996:Valve & New Aluminum Tee installed
09/16/2004:D1 Module inlet Changed from Wedding to Sierra
09/16/2004:A1 Module Flow Calibration
09/16/2004:B1 Module Flow Calibration
09/16/2004:C1 Module Flow Calibration
09/16/2004:D1 Module Flow Calibration
09/16/2004:Routine annual maintenance
09/13/2001:smoke from starr fire still lingering.
09/07/2001:Smoke from French meadow/hell hole fire all week
08/29/2001:smoke from desolation wilderness fire continues
08/26/2001:noticable smoke from Desolation Wild.
08/21/2002:smoke in area from fire
08/20/2001:very smokey...several fires...
08/17/2001:C1 Module Flow Calibration
08/17/2001:Repaired B1 Mod Cyclone
08/16/2000:Version 2 sampler installed
08/15/2002:smoky all week due to fire
08/15/2000:Replaced Temperature probe
08/08/2001:Emmigrant Gap fire on back side of Squaw..started poss. on Sunday
08/01/1998:Site turned off
07/31/2002:Ice House Road fire still going
07/28/2002:fire at ice house road beginning 7/26/02
07/24/2001:A1 Module Flow Calibration
07/24/2001:B1 Module Flow Calibration
07/24/2001:C1 Module Flow Calibration
07/24/2001:D1 Module Flow Calibration
07/24/2001:Photos taken
07/24/2001:Routine annual maintenance
07/15/2003:Sampler controller replaced
07/12/2000:Replaced PM10 inlet with Wedding
07/07/2000:A1 Module Flow Calibration
07/07/2000:B1 Module Flow Calibration
07/07/2000:C1 Module Flow Calibration
07/07/2000:D1 Module Flow Calibration
07/07/2000:Routine annual maintenance
06/28/1994:Changed nylon filter size from 47mm diameter to 25mm
05/30/1997:replaced the denuder
05/09/1997:A1 B1 C1 D1 Module pumps replaced
05/09/1997:A1 Module Flow Calibration
05/09/1997:B1 Module Flow Calibration
05/09/1997:C1 Module Flow Calibration
05/09/1997:D1 Module Flow Calibration
05/09/1997:Routine annual maintenance
04/29/1998:Changed BLIS1 03/02/96 QD TO NM
04/29/1998:Changed BLIS1 02/19/97 QD TO NM
04/26/2004:A1 Module pumps replaced
04/26/2004:D1 Module pumps replaced
04/26/2004:Photos taken
04/26/2004:Routine annual maintenance
04/23/1997:Sampler controller clock replaced
04/13/2004:Sampler controller replaced
03/10/2004:A1 Module area increased from 2.20 to 3.53 sq cm
03/07/1994:A1 Module Flow Calibration
03/07/1994:B1 Module Flow Calibration
03/07/1994:C1 Module Flow Calibration
03/07/1994:D1 Module Flow Calibration
03/07/1994:Routine annual maintenance
02/25/2003:D1 Module pump replaced
02/08/1995:A1 Module Flow Calibration
02/08/1995:B1 Module Flow Calibration
02/08/1995:C1 Module Flow Calibration
02/08/1995:D1 Module Flow Calibration
02/08/1995:Routine annual maintenance
01/21/2000:A1 Module Flow Calibration
01/21/2000:B1 Module Flow Calibration
01/21/2000:C1 Module Flow Calibration
01/21/2000:D1 Module Flow Calibration
01/20/2004:Sampler controller replaced