Site Details |
| Country: | United States |
| State: | California (pop. 29760021) |
| County: | El Dorado County (pop. 125995) |
| Location2: | Above SW shore of Lake Tahoe, CA,1/4 mile beyond headquarters on the service road |
| Latitude: | 38.9761 |
| Longitude: | -120.1025 |
| Elevation: | 2130m above MSL |
| EPA Code: | 060179000 |
| Agency: | US Forest Service |
| Sponsor: | USFS |
| Region: | Oregon and Northern California |
| Land Use: | Unknown |
| AQCR: | None |
| Dates: | 11/1990 - Present |
| SiteID: | 95 |
| SiteCode: | BLIS1 |
| SiteName: | Bliss SP (TRPA) |
| Maps: | Google, MSN, Yahoo |
Site History |
| 12/31/2003: | C1 Module pump replaced |
| 12/08/1995: | A1 Module Flow Calibration |
| 12/08/1995: | B1 Module Flow Calibration |
| 12/08/1995: | C1 Module Flow Calibration |
| 12/08/1995: | D1 Module Flow Calibration |
| 12/08/1995: | Routine annual maintenance |
| 12/04/1999: | Site turned on |
| 12/03/1999: | A1 Module Flow Calibration |
| 12/03/1999: | B1 Module Flow Calibration |
| 12/03/1999: | C1 Module Flow Calibration |
| 11/19/1999: | Version 2 IMPROVE sampler installed |
| 11/19/1999: | A1 Module Flow Calibration |
| 11/19/1999: | B1 Module Flow Calibration |
| 11/19/1999: | C1 Module Flow Calibration |
| 11/19/1999: | D1 Module Flow Calibration |
| 11/12/1997: | Prescribed fire nearby. |
| 11/08/2003: | A1 Module Flow Calibration |
| 11/08/2003: | A1 Module pump replaced |
| 11/08/2003: | B1 Module Flow Calibration |
| 11/08/2003: | B1 Module pump replaced |
| 11/08/2003: | C1 Module Flow Calibration |
| 11/08/2003: | D1 Module Flow Calibration |
| 11/08/2003: | Photos taken |
| 11/08/2003: | Routine annual maintenance |
| 11/08/1995: | Prescribed fire |
| 11/01/1995: | Prescribed fire |
| 10/29/1997: | Prescribed fire nearby. |
| 10/28/2001: | smoke from Stanislaus fire |
| 10/26/2002: | A1 Module Flow Calibration |
| 10/26/2002: | A1 Module pumps replaced |
| 10/26/2002: | B1 Module Flow Calibration |
| 10/26/2002: | B1 Module pumps replaced |
| 10/26/2002: | C1 Module Flow Calibration |
| 10/26/2002: | D1 Module Flow Calibration |
| 10/26/2002: | Photos taken |
| 10/26/2002: | Routine annual maintenance |
| 10/25/1995: | Prescribed fire |
| 10/22/1997: | Prescribed fire nearby. |
| 10/18/1995: | Prescribed fire |
| 10/15/1997: | Prescribed fire nearby. |
| 10/10/2000: | A1 Module Flow Calibration |
| 10/10/2000: | B1 Module Flow Calibration |
| 10/10/2000: | C1 Module Flow Calibration |
| 10/10/2000: | D1 Module Flow Calibration |
| 10/10/2000: | Photos taken |
| 10/10/2000: | Routine annual maintenance |
| 10/01/1997: | Prescribed fire nearby. |
| 09/24/2003: | smoky all week due to fire |
| 09/23/1996: | D1 Module pump replaced |
| 09/23/1996: | Valve & New Aluminum Tee installed |
| 09/16/2004: | D1 Module inlet Changed from Wedding to Sierra |
| 09/16/2004: | A1 Module Flow Calibration |
| 09/16/2004: | B1 Module Flow Calibration |
| 09/16/2004: | C1 Module Flow Calibration |
| 09/16/2004: | D1 Module Flow Calibration |
| 09/16/2004: | Routine annual maintenance |
| 09/13/2001: | smoke from starr fire still lingering. |
| 09/07/2001: | Smoke from French meadow/hell hole fire all week |
| 08/29/2001: | smoke from desolation wilderness fire continues |
| 08/26/2001: | noticable smoke from Desolation Wild. |
| 08/21/2002: | smoke in area from fire |
| 08/20/2001: | very smokey...several fires... |
| 08/17/2001: | C1 Module Flow Calibration |
| 08/17/2001: | Repaired B1 Mod Cyclone |
| 08/16/2000: | Version 2 sampler installed |
| 08/15/2002: | smoky all week due to fire |
| 08/15/2000: | Replaced Temperature probe |
| 08/08/2001: | Emmigrant Gap fire on back side of Squaw..started poss. on Sunday |
| 08/01/1998: | Site turned off |
| 07/31/2002: | Ice House Road fire still going |
| 07/28/2002: | fire at ice house road beginning 7/26/02 |
| 07/24/2001: | A1 Module Flow Calibration |
| 07/24/2001: | B1 Module Flow Calibration |
| 07/24/2001: | C1 Module Flow Calibration |
| 07/24/2001: | D1 Module Flow Calibration |
| 07/24/2001: | Photos taken |
| 07/24/2001: | Routine annual maintenance |
| 07/15/2003: | Sampler controller replaced |
| 07/12/2000: | Replaced PM10 inlet with Wedding |
| 07/07/2000: | A1 Module Flow Calibration |
| 07/07/2000: | B1 Module Flow Calibration |
| 07/07/2000: | C1 Module Flow Calibration |
| 07/07/2000: | D1 Module Flow Calibration |
| 07/07/2000: | Routine annual maintenance |
| 06/28/1994: | Changed nylon filter size from 47mm diameter to 25mm |
| 05/30/1997: | replaced the denuder |
| 05/09/1997: | A1 B1 C1 D1 Module pumps replaced |
| 05/09/1997: | A1 Module Flow Calibration |
| 05/09/1997: | B1 Module Flow Calibration |
| 05/09/1997: | C1 Module Flow Calibration |
| 05/09/1997: | D1 Module Flow Calibration |
| 05/09/1997: | Routine annual maintenance |
| 04/29/1998: | Changed BLIS1 03/02/96 QD TO NM |
| 04/29/1998: | Changed BLIS1 02/19/97 QD TO NM |
| 04/26/2004: | A1 Module pumps replaced |
| 04/26/2004: | D1 Module pumps replaced |
| 04/26/2004: | Photos taken |
| 04/26/2004: | Routine annual maintenance |
| 04/23/1997: | Sampler controller clock replaced |
| 04/13/2004: | Sampler controller replaced |
| 03/10/2004: | A1 Module area increased from 2.20 to 3.53 sq cm |
| 03/07/1994: | A1 Module Flow Calibration |
| 03/07/1994: | B1 Module Flow Calibration |
| 03/07/1994: | C1 Module Flow Calibration |
| 03/07/1994: | D1 Module Flow Calibration |
| 03/07/1994: | Routine annual maintenance |
| 02/25/2003: | D1 Module pump replaced |
| 02/08/1995: | A1 Module Flow Calibration |
| 02/08/1995: | B1 Module Flow Calibration |
| 02/08/1995: | C1 Module Flow Calibration |
| 02/08/1995: | D1 Module Flow Calibration |
| 02/08/1995: | Routine annual maintenance |
| 01/21/2000: | A1 Module Flow Calibration |
| 01/21/2000: | B1 Module Flow Calibration |
| 01/21/2000: | C1 Module Flow Calibration |
| 01/21/2000: | D1 Module Flow Calibration |
| 01/20/2004: | Sampler controller replaced |