Crater Lake NP (CRLA1)
Site Details
Country:United States
State:Oregon (pop. 2842321)
County:Klamath County (pop. 57702)
Location2:Park Headquarters, maintenance area
Latitude:42.8958
Longitude:-122.1361
Elevation:1996m above MSL
EPA Code:410358001
Agency:National Park Service
Sponsor:NPS
Region:Oregon and Northern California
Land Use:Unknown
AQCR:None
Dates:3/1988 - Present
SiteID:86
SiteCode:CRLA1
SiteName:Crater Lake NP
Maps:Google, MSN, Yahoo
Site History
11/09/2004:A1 Module Flow Calibration
11/09/2004:B1 Module Flow Calibration
11/09/2004:C1 Module Flow Calibration
11/09/2004:D1 Module Flow Calibration
11/09/2004:D1 Module inlet Changed from Wedding to Sierra
11/09/2004:Routine annual maintenance
10/21/2003:A1 Module electronics box replaced
10/21/2003:A1 Module Flow Calibration
10/21/2003:A1 Module pump replaced
10/21/2003:B1 Module Flow Calibration
10/21/2003:B1 Module pump replaced
10/21/2003:C1 Module Flow Calibration
10/21/2003:D1 Module electronics box swapped with C1 Module electronics box
10/21/2003:D1 Module Flow Calibration
10/21/2003:Photos Taken
10/21/2003:Routine annual maintenance
10/03/1994:A1 Module Flow Calibration
10/03/1994:B1 Module Flow Calibration
10/03/1994:C1 Module Flow Calibration
10/03/1994:C1 Module solenoid replaced
10/03/1994:D1 Module Flow Calibration
10/03/1994:Routine annual maintenance
09/25/2001:Routine annual maintenance
09/22/1997:A1 Module pump replaced
09/22/1997:D1 Module solenoid replaced
09/19/1995:A1 Module Flow Calibration
09/19/1995:B1 Module Flow Calibration
09/19/1995:C1 Module Flow Calibration
09/19/1995:D1 Module Flow Calibration
09/19/1995:Routine annual maintenance
09/13/1996:A1 Module Flow Calibration
09/13/1996:Added glycerin to Module B1 denuder
09/13/1996:B1 Module Flow Calibration
09/13/1996:C1 Module Flow Calibration
09/13/1996:D1 Module Flow Calibration
09/13/1996:Routine annual maintenance
09/10/2004:A1 Module Flow Calibration
09/10/2004:B1 Module Flow Calibration
09/10/2004:C1 Module Flow Calibration
09/10/2004:D1 Module Flow Calibration
09/10/2004:Photos Taken
09/10/2004:Routine annual maintenance
09/10/2004:Sampler controller replaced
09/07/2001:A1 Module Flow Calibration
09/07/2001:B1 Module Flow Calibration
09/07/2001:C1 Module Flow Calibration
09/07/2001:D1 Module Flow Calibration
09/07/2001:Photos Taken
09/06/1997:Routine annual maintenance
09/05/1997:A1 Module Flow Calibration
09/05/1997:B1 Module Flow Calibration
09/05/1997:C1 Module Flow Calibration
09/05/1997:D1 Module Flow Calibration
08/22/2000:A1 Module Flow Calibration
08/22/2000:B1 Module Flow Calibration
08/22/2000:C1 Module Flow Calibration
08/22/2000:D1 Module Flow Calibration
08/21/1996:lots of smoke in the area from fire
07/31/2002:A1 Module Flow Calibration
07/31/2002:A1 Module pump replaced
07/31/2002:B1 Module Flow Calibration
07/31/2002:B1 Module pump replaced
07/31/2002:C1 Module Flow Calibration
07/31/2002:D1 Module Flow Calibration
07/31/2002:Photos Taken
07/31/2002:Routine annual maintenance
07/11/1998:B1 Module Flow Calibration
07/11/1998:C1 Module Flow Calibration
07/11/1998:D1 Module Flow Calibration
07/11/1998:Routine annual maintenance
07/11/1998:A1 Module Flow Calibration
06/28/1994:Changed nylon filter size from 47mm diameter to 25mm
06/01/1994:B1 Module Flow Calibration
03/10/2004:A1 Module area increased from 2.20 to 3.53 sq cm
03/09/2000:Version 2 IMPROVE sampler installed
03/09/2000:A1 Module Flow Calibration
03/09/2000:B1 Module Flow Calibration
03/09/2000:C1 Module Flow Calibration
03/09/2000:D1 Module Flow Calibration
03/09/2000:Version 2 sampler installed
03/02/2001:A1 offline until 6/6/01
02/01/1999:A1 Module Flow Calibration
01/06/2004:Sampler controller replaced