Site Details |
| Country: | United States |
| State: | Oregon (pop. 2842321) |
| County: | Klamath County (pop. 57702) |
| Location2: | Park Headquarters, maintenance area |
| Latitude: | 42.8958 |
| Longitude: | -122.1361 |
| Elevation: | 1996m above MSL |
| EPA Code: | 410358001 |
| Agency: | National Park Service |
| Sponsor: | NPS |
| Region: | Oregon and Northern California |
| Land Use: | Unknown |
| AQCR: | None |
| Dates: | 3/1988 - Present |
| SiteID: | 86 |
| SiteCode: | CRLA1 |
| SiteName: | Crater Lake NP |
| Maps: | Google, MSN, Yahoo |
Site History |
| 11/09/2004: | A1 Module Flow Calibration |
| 11/09/2004: | B1 Module Flow Calibration |
| 11/09/2004: | C1 Module Flow Calibration |
| 11/09/2004: | D1 Module Flow Calibration |
| 11/09/2004: | D1 Module inlet Changed from Wedding to Sierra |
| 11/09/2004: | Routine annual maintenance |
| 10/21/2003: | A1 Module electronics box replaced |
| 10/21/2003: | A1 Module Flow Calibration |
| 10/21/2003: | A1 Module pump replaced |
| 10/21/2003: | B1 Module Flow Calibration |
| 10/21/2003: | B1 Module pump replaced |
| 10/21/2003: | C1 Module Flow Calibration |
| 10/21/2003: | D1 Module electronics box swapped with C1 Module electronics box |
| 10/21/2003: | D1 Module Flow Calibration |
| 10/21/2003: | Photos Taken |
| 10/21/2003: | Routine annual maintenance |
| 10/03/1994: | A1 Module Flow Calibration |
| 10/03/1994: | B1 Module Flow Calibration |
| 10/03/1994: | C1 Module Flow Calibration |
| 10/03/1994: | C1 Module solenoid replaced |
| 10/03/1994: | D1 Module Flow Calibration |
| 10/03/1994: | Routine annual maintenance |
| 09/25/2001: | Routine annual maintenance |
| 09/22/1997: | A1 Module pump replaced |
| 09/22/1997: | D1 Module solenoid replaced |
| 09/19/1995: | A1 Module Flow Calibration |
| 09/19/1995: | B1 Module Flow Calibration |
| 09/19/1995: | C1 Module Flow Calibration |
| 09/19/1995: | D1 Module Flow Calibration |
| 09/19/1995: | Routine annual maintenance |
| 09/13/1996: | A1 Module Flow Calibration |
| 09/13/1996: | Added glycerin to Module B1 denuder |
| 09/13/1996: | B1 Module Flow Calibration |
| 09/13/1996: | C1 Module Flow Calibration |
| 09/13/1996: | D1 Module Flow Calibration |
| 09/13/1996: | Routine annual maintenance |
| 09/10/2004: | A1 Module Flow Calibration |
| 09/10/2004: | B1 Module Flow Calibration |
| 09/10/2004: | C1 Module Flow Calibration |
| 09/10/2004: | D1 Module Flow Calibration |
| 09/10/2004: | Photos Taken |
| 09/10/2004: | Routine annual maintenance |
| 09/10/2004: | Sampler controller replaced |
| 09/07/2001: | A1 Module Flow Calibration |
| 09/07/2001: | B1 Module Flow Calibration |
| 09/07/2001: | C1 Module Flow Calibration |
| 09/07/2001: | D1 Module Flow Calibration |
| 09/07/2001: | Photos Taken |
| 09/06/1997: | Routine annual maintenance |
| 09/05/1997: | A1 Module Flow Calibration |
| 09/05/1997: | B1 Module Flow Calibration |
| 09/05/1997: | C1 Module Flow Calibration |
| 09/05/1997: | D1 Module Flow Calibration |
| 08/22/2000: | A1 Module Flow Calibration |
| 08/22/2000: | B1 Module Flow Calibration |
| 08/22/2000: | C1 Module Flow Calibration |
| 08/22/2000: | D1 Module Flow Calibration |
| 08/21/1996: | lots of smoke in the area from fire |
| 07/31/2002: | A1 Module Flow Calibration |
| 07/31/2002: | A1 Module pump replaced |
| 07/31/2002: | B1 Module Flow Calibration |
| 07/31/2002: | B1 Module pump replaced |
| 07/31/2002: | C1 Module Flow Calibration |
| 07/31/2002: | D1 Module Flow Calibration |
| 07/31/2002: | Photos Taken |
| 07/31/2002: | Routine annual maintenance |
| 07/11/1998: | B1 Module Flow Calibration |
| 07/11/1998: | C1 Module Flow Calibration |
| 07/11/1998: | D1 Module Flow Calibration |
| 07/11/1998: | Routine annual maintenance |
| 07/11/1998: | A1 Module Flow Calibration |
| 06/28/1994: | Changed nylon filter size from 47mm diameter to 25mm |
| 06/01/1994: | B1 Module Flow Calibration |
| 03/10/2004: | A1 Module area increased from 2.20 to 3.53 sq cm |
| 03/09/2000: | Version 2 IMPROVE sampler installed |
| 03/09/2000: | A1 Module Flow Calibration |
| 03/09/2000: | B1 Module Flow Calibration |
| 03/09/2000: | C1 Module Flow Calibration |
| 03/09/2000: | D1 Module Flow Calibration |
| 03/09/2000: | Version 2 sampler installed |
| 03/02/2001: | A1 offline until 6/6/01 |
| 02/01/1999: | A1 Module Flow Calibration |
| 01/06/2004: | Sampler controller replaced |