Three Sisters Wilderness (THSI1)
Site Details
Country:United States
State:Oregon (pop. 2842321)
County:Lane County (pop. 282912)
Location2:Carmen Smith Project EWEB facility radio transmitter bldg, 3/4 mile N. of Trail Bridge Campground, OR, Rt.126
Latitude:44.291
Longitude:-122.0434
Elevation:885m above MSL
EPA Code:410390070
Agency:US Forest Service
Sponsor:USFS
Region:Oregon and Northern California
Land Use:Unknown
AQCR:None
Dates:7/1993 - Present
SiteID:84
SiteCode:THSI1
SiteName:Three Sisters Wilderness
Maps:Google, MSN, Yahoo
Site History
10/24/2003:B1 cyclone throat replaced
10/24/2003:B1 Module Flow Calibration
10/21/2003:A1 Module Flow Calibration
10/21/2003:A1 Module pump replaced
10/21/2003:B1 Module Flow Calibration
10/21/2003:B1 Module pump replaced
10/21/2003:C1 Module Flow Calibration
10/21/2003:C1 Module pump replaced
10/21/2003:D1 Module Flow Calibration
10/21/2003:D1 Module pump replaced
10/21/2003:Photos taken
10/21/2003:Routine annual maintenance
10/03/1994:A1 Module Flow Calibration
10/03/1994:A1 Module pump replaced
10/03/1994:B1 Module Flow Calibration
10/03/1994:B1 Module pump replaced
10/03/1994:C1 Module Flow Calibration
10/03/1994:C1 Module pump replaced
10/03/1994:D1 Module Flow Calibration
10/03/1994:D1 Module pump replaced
10/03/1994:Routine annual maintenance
09/22/1997:B1 Module elapsed timer replaced
09/21/2001:A1 Module Flow Calibration
09/21/2001:B1 Module Flow Calibration
09/21/2001:C1 Module Flow Calibration
09/21/2001:D1 Module Flow Calibration
09/21/2001:Photos taken
09/21/2001:Routine annual maintenance
09/20/1995:A1 Module Flow Calibration
09/20/1995:B1 Module Flow Calibration
09/20/1995:C1 Module Flow Calibration
09/20/1995:D1 Module Flow Calibration
09/16/1996:A1 Module Flow Calibration
09/16/1996:A1 Module pump replaced
09/16/1996:Added glycerin to Module B1 denuder
09/16/1996:B1 Module Flow Calibration
09/16/1996:B1 Module pump replaced
09/16/1996:C1 Module Flow Calibration
09/16/1996:C1 Module pump replaced
09/16/1996:D1 Module Flow Calibration
09/16/1996:D1 Module pump replaced
09/16/1996:Routine annual maintenance
09/10/2004:A1 Module Flow Calibration
09/10/2004:B1 Module Flow Calibration
09/10/2004:C1 Module Flow Calibration
09/10/2004:D1 Module Flow Calibration
09/10/2004:Photos taken
09/10/2004:Routine annual maintenance
09/07/1997:A1 Module Flow Calibration
09/07/1997:B1 Module Flow Calibration
09/07/1997:C1 Module Flow Calibration
09/07/1997:D1 Module Flow Calibration
09/07/1997:Routine annual maintenance
08/28/2003:B and B complex fire is burning nearby this week
08/25/1999:Fire in the Williamette Valley
08/22/2000:A1 Module Flow Calibration
08/22/2000:B1 Module Flow Calibration
08/22/2000:C1 Module Flow Calibration
08/22/2000:D1 Module Flow Calibration
08/08/1998:Fire in area
08/08/1995:Routine annual maintenance
07/24/2002:A1 Module Flow Calibration
07/24/2002:A1 Module pump replaced
07/24/2002:B1 Module Flow Calibration
07/24/2002:B1 Module pump replaced
07/24/2002:C1 Module Flow Calibration
07/24/2002:D1 Module Flow Calibration
07/24/2002:Photos taken
07/24/2002:pump mufflers replaced
07/24/2002:Routine annual maintenance
07/14/1998:A1 Module pump replaced
07/14/1998:B1 Module pump replaced
07/14/1998:C1 Module pump replaced
07/14/1998:D1 Module pump replaced
07/11/2003:Fire in the area recently
07/10/1998:A1 Module Flow Calibration
07/10/1998:B1 Module Flow Calibration
07/10/1998:C1 Module Flow Calibration
07/10/1998:D1 Module Flow Calibration
07/10/1998:Routine annual maintenance
07/06/2004:Sampler controller replaced
06/28/1994:Changed nylon filter size from 47mm diameter to 25mm
05/06/2004:Prescribed fire 10 mi NE from the site
04/03/2003:Logging show currently underway at site
03/10/2004:A1 Module area increased from 2.20 to 3.53 sq cm
03/10/2000:Version 2 IMPROVE sampler installed
03/10/2000:A1 Module Flow Calibration
03/10/2000:B1 Module Flow Calibration
03/10/2000:C1 Module Flow Calibration
03/10/2000:D1 Module Flow Calibration
03/10/2000:Version 2 sampler installed
02/03/2004:B1 Module Flow Calibration