Site Details |
| Country: | United States |
| State: | Washington (pop. 4866692) |
| County: | Okanogan County (pop. 33350) |
| Location2: | Loup-loup ski area, Hwy 20 E of Twisp, WA |
| Latitude: | 48.3877 |
| Longitude: | -119.9275 |
| Elevation: | 1627m above MSL |
| EPA Code: | 530470012 |
| Agency: | US Forest Service |
| Sponsor: | USFS |
| Region: | Northwest |
| Land Use: | Unknown |
| AQCR: | None |
| Dates: | 11/2000 - Present |
| SiteID: | 82 |
| SiteCode: | PASA1 |
| SiteName: | Pasayten |
| Maps: | Google, MSN, Yahoo |
Site History |
| 11/15/2000: | New IMPROVE site, version 2 sampler installed |
| 10/26/2002: | Construction being done 20 feet from building lots of dust in air until 11/16/2002 |
| 09/18/2001: | A1 Module Flow Calibration |
| 09/18/2001: | A1 Module pump replaced |
| 09/18/2001: | B1 Module Flow Calibration |
| 09/18/2001: | C1 Module Flow Calibration |
| 09/18/2001: | C1 Module pump replaced |
| 09/18/2001: | D1 Module Flow Calibration |
| 09/18/2001: | D1 Module pump replaced |
| 09/18/2001: | Routine annual maintenance |
| 08/07/2002: | Sampler controller replaced |
| 07/28/2003: | D1 Module pump replaced |
| 07/28/2002: | A1 Module Flow Calibration |
| 07/28/2002: | A1 Module pump replaced |
| 07/28/2002: | B1 Module Flow Calibration |
| 07/28/2002: | B1 Module pump replaced |
| 07/28/2002: | C1 Module Flow Calibration |
| 07/28/2002: | D1 Module Flow Calibration |
| 07/28/2002: | Photos taken |
| 07/28/2002: | Routine annual maintenance |
| 07/27/2004: | A1 Module Flow Calibration |
| 07/27/2004: | B1 Module Flow Calibration |
| 07/27/2004: | C1 Module Flow Calibration |
| 07/27/2004: | D1 Module Flow Calibration |
| 07/27/2004: | Photos taken |
| 07/27/2004: | Routine annual maintenance |
| 07/19/2001: | Sampler controller replaced |
| 07/17/2003: | Lots of outlying smoke from fire |
| 06/04/2004: | Sampler controller replaced |
| 06/01/2001: | B1 Module Flow Calibration |
| 04/18/2003: | Sampler controller replaced |
| 04/15/2003: | D1 Module pump replaced |
| 04/15/2003: | Sampler controller replaced |
| 03/31/2004: | Fire burning across valley |
| 03/10/2004: | A1 Module area increased from 2.20 to 3.53 sq cm |
| 01/23/2004: | A1 Module Flow Calibration |
| 01/18/2004: | A1 Module Flow Calibration |
| 01/18/2004: | B1 Module Flow Calibration |
| 01/18/2004: | C1 Module Flow Calibration |
| 01/18/2004: | D1 Module Flow Calibration |
| 01/11/2001: | Version 2 sampler installed |
| 01/09/2001: | A1 Module Flow Calibration |
| 01/09/2001: | B1 Module Flow Calibration |
| 01/09/2001: | C1 Module Flow Calibration |
| 01/09/2001: | D1 Module Flow Calibration |