Dolly Sods Wilderness (DOSO1)
Site Details
Country:United States
State:West Virginia (pop. 1793477)
County:Tucker County (pop. 7728)
Location2:Bearden Knob, 3 mi SE of Davis, WV
Latitude:39.1053
Longitude:-79.4261
Elevation:1182m above MSL
EPA Code:540939000
Agency:US Forest Service
Sponsor:USFS
Region:Appalachia
Land Use:Unknown
AQCR:None
Dates:9/1991 - Present
SiteID:8
SiteCode:DOSO1
SiteName:Dolly Sods Wilderness
Maps:Google, MSN, Yahoo
Site History
12/17/1996:D1 Module Flow Calibration
11/19/2004:C1 Module pump replaced
09/12/2002:A1 Module Flow Calibration
09/12/2002:A1 Module pump replaced
09/12/2002:A1 Module relay box replaced
09/12/2002:B1 Module Flow Calibration
09/12/2002:B1 Module pump replaced
09/12/2002:C1 Module Flow Calibration
09/12/2002:D1 Module Flow Calibration
09/12/2002:Photos Taken
09/12/2002:Routine annual maintenance
09/11/2000:A1 Module Flow Calibration
09/11/2000:B1 Module Flow Calibration
09/11/2000:C1 Module Flow Calibration
09/11/2000:D1 Module Flow Calibration
08/31/1997:A1 Module Flow Calibration
08/31/1997:B1 Module Flow Calibration
08/31/1997:C1 Module Flow Calibration
08/31/1997:D1 Module Flow Calibration
08/31/1997:Routine annual maintenance
08/29/1995:A1 Module Flow Calibration
08/29/1995:B1 Module Flow Calibration
08/29/1995:C1 Module Flow Calibration
08/29/1995:D1 Module Flow Calibration
08/29/1995:Routine annual maintenance
08/26/1994:A1 Module Flow Calibration
08/26/1994:B1 Module Flow Calibration
08/26/1994:C1 Module Flow Calibration
08/26/1994:D1 Module Flow Calibration
08/26/1994:Routine annual maintenance
08/19/1996:A1 Module Flow Calibration
08/19/1996:Added glycerin to Module B1 denuder
08/19/1996:B1 Module Flow Calibration
08/19/1996:C1 Module Flow Calibration
08/19/1996:D1 Module Flow Calibration
08/19/1996:Routine annual maintenance
08/10/2001:A1 Module Flow Calibration
08/10/2001:B1 Module Flow Calibration
08/10/2001:C1 Module Flow Calibration
08/10/2001:D1 Module Flow Calibration
08/10/2001:Photos Taken
08/10/2001:Routine annual maintenance
08/04/1998:A1 Module Flow Calibration
08/04/1998:Routine annual maintenance
07/18/2003:Photos Taken
07/18/2003:Routine annual maintenance
07/18/2003:A1 Module Flow Calibration
07/18/2003:B1 Module Flow Calibration
07/18/2003:C1 Module Flow Calibration
07/18/2003:C1 Module pump replaced
07/18/2003:D1 Module Flow Calibration
07/18/2003:D1 Module pump replaced
06/28/1994:Changed nylon filter size from 47mm diameter to 25mm
06/25/2004:A1 Module Flow Calibration
06/25/2004:B1 Module Flow Calibration
06/25/2004:C1 Module Flow Calibration
06/25/2004:D1 Module Flow Calibration
06/25/2004:Photos Taken
06/25/2004:Routine annual maintenance
06/10/1997:A1 Module Flow Calibration
06/10/1997:B1 Module Flow Calibration
06/10/1997:C1 Module Flow Calibration
06/10/1997:D1 Module Flow Calibration
06/10/1997:Routine annual maintenance
06/01/1997:NH4+ species taken by IC off the nylon filter. The nylon filter extraction used deionized water as opposed to the sodium carbonate/sodium bicarbonate solution normally used.
04/19/1995:A1 Module area increased from 2.20 to 3.53 sq cm
01/12/2000:A1 Module area set at 3.53 sq cm
01/12/2000:A1 Module Flow Calibration
01/12/2000:B1 Module Flow Calibration
01/12/2000:C1 Module Flow Calibration
01/12/2000:D1 Module Flow Calibration
01/12/2000:Photos Taken
01/12/2000:Version 2 sampler installed
01/12/2000:Version 2 IMPROVE sampler installed
01/12/1999:A1 Module Flow Calibration
01/12/1999:B1 Module Flow Calibration
01/12/1999:C1 Module Flow Calibration
01/12/1999:D1 Module Flow Calibration
01/12/1999:Routine annual maintenance