Site Details |
| Country: | United States |
| State: | Oregon (pop. 2842321) |
| County: | Union County (pop. 23598) |
| Latitude: | 45.2249 |
| Longitude: | -118.5129 |
| Elevation: | 1259m above MSL |
| EPA Code: | 410610010 |
| Agency: | US Forest Service |
| Sponsor: | USFS |
| Region: | Hells Canyon |
| Land Use: | Unknown |
| AQCR: | None |
| Dates: | 3/2000 - Present |
| SiteID: | 76 |
| SiteCode: | STAR1 |
| SiteName: | Starkey |
| Maps: | Google, MSN, Yahoo |
Site History |
| 10/30/2003: | Prescribed fire continues 1 mile N and 1 mile W |
| 10/11/2002: | Prescribed fire in area for three weeks |
| 10/06/2003: | Prescribed fire, increased traffic due to hunt season |
| 10/01/2003: | A1 Module Flow Calibration |
| 10/01/2003: | B1 Module Flow Calibration |
| 10/01/2003: | C1 Module Flow Calibration |
| 10/01/2003: | C1 Module pump replaced |
| 10/01/2003: | D1 Module Flow Calibration |
| 10/01/2003: | D1 Module pump replaced |
| 10/01/2003: | Photos taken |
| 10/01/2003: | Routine annual maintenance |
| 09/27/2000: | logging activity this week |
| 09/23/2002: | Prescribed fire in area this week |
| 09/08/2001: | B1 Module Flow Calibration |
| 09/08/2001: | C1 Module Flow Calibration |
| 09/08/2001: | D1 Module Flow Calibration |
| 09/08/2001: | Routine annual maintenance |
| 09/08/2001: | A1 Module Flow Calibration |
| 09/06/2003: | Smoke from fire outside immediate area blown over this past week |
| 08/31/2003: | bow hunting started, increased activity past collection site |
| 08/31/2000: | A1 Module Flow Calibration |
| 08/31/2000: | B1 Module Flow Calibration |
| 08/31/2000: | C1 Module Flow Calibration |
| 08/31/2000: | D1 Module Flow Calibration |
| 08/26/2001: | Continued traffic from log and chip trucks |
| 08/23/2001: | C1 Module pump replaced |
| 08/22/2003: | Fire north and west, but none in immediate area |
| 08/19/2000: | Smoke from distant fire |
| 08/17/2001: | Increased road traffic |
| 08/14/2001: | Fire 30 miles west of the site |
| 08/06/2002: | hazy from area fire, increased traffic this week |
| 08/02/2001: | Road traffic from chip trucks continues |
| 07/24/2001: | A1 Module electronics box replaced |
| 07/20/2004: | A1 Module Flow Calibration |
| 07/20/2004: | B1 Module Flow Calibration |
| 07/20/2004: | C1 Module Flow Calibration |
| 07/20/2004: | D1 Module Flow Calibration |
| 07/20/2004: | Photos taken |
| 07/20/2004: | Routine annual maintenance |
| 07/12/2001: | Road traffic from chip trucks continues for two weeks |
| 07/10/2002: | Hazy from fire |
| 06/24/2002: | A1 Module Flow Calibration |
| 06/24/2002: | A1 Module pump replaced |
| 06/24/2002: | B1 Module Flow Calibration |
| 06/24/2002: | B1 Module pump replaced |
| 06/24/2002: | C1 Module Flow Calibration |
| 06/24/2002: | D1 Module Flow Calibration |
| 06/24/2002: | Photos taken |
| 06/24/2002: | Routine annual maintenance |
| 06/24/2002: | Temperature probe replaced |
| 06/20/2003: | Log truck traffic continues until 08/28/2003 |
| 06/17/2004: | A1 Module area increased from 2.20 to 3.53 sq cm |
| 05/10/2001: | Prescribed fire |
| 04/05/2000: | Prescribed fire 50 yards north |
| 03/22/2000: | Prescribed fire 50 yards north |
| 03/18/2000: | Prescribed fire 50 yards north |
| 03/12/2000: | Version 2 sampler installed |
| 03/07/2000: | New IMPROVE site, version 2 sampler installed |
| 03/07/2000: | A1 Module Flow Calibration |
| 03/07/2000: | B1 Module Flow Calibration |
| 03/07/2000: | C1 Module Flow Calibration |
| 03/07/2000: | D1 Module Flow Calibration |
| 03/07/2000: | Photos taken |