Site Details |
| Country: | United States |
| State: | Idaho (pop. 1006749) |
| County: | Custer County (pop. 4133) |
| Location2: | USFS Stanley Station Warehouse, Stanley, ID |
| Latitude: | 44.1705 |
| Longitude: | -114.9271 |
| Elevation: | 1990m above MSL |
| EPA Code: | 160370002 |
| Agency: | US Forest Service |
| Sponsor: | USFS |
| Region: | Hells Canyon |
| Land Use: | Unknown |
| AQCR: | None |
| Dates: | 1/1994 - Present |
| SiteID: | 70 |
| SiteCode: | SAWT1 |
| SiteName: | Sawtooth NF |
| Maps: | Google, MSN, Yahoo |
Site History |
| 12/23/2003: | D1 Module pump replaced |
| 12/10/2002: | Sampler controller replaced |
| 10/29/2002: | Sampler controller replaced |
| 10/26/2002: | two Diesel engines run each morning next to site |
| 10/23/1996: | Prescribed fire |
| 10/18/2000: | Version 2 sampler installed |
| 10/11/2000: | A1 Module Flow Calibration |
| 10/11/2000: | B1 Module Flow Calibration |
| 10/11/2000: | C1 Module Flow Calibration |
| 10/11/2000: | D1 Module Flow Calibration |
| 10/10/2000: | Version 2 IMPROVE sampler installed |
| 09/29/2003: | A1 Module Flow Calibration |
| 09/29/2003: | A1 Module pump replaced |
| 09/29/2003: | B1 Module Flow Calibration |
| 09/29/2003: | B1 Module pump replaced |
| 09/29/2003: | C1 Module Flow Calibration |
| 09/29/2003: | D1 Module Flow Calibration |
| 09/29/2003: | Photos taken |
| 09/29/2003: | Routine annual maintenance |
| 09/29/1994: | A1 Module Flow Calibration |
| 09/29/1994: | Routine annual maintenance |
| 09/22/1997: | Elapsed timer replaced |
| 09/15/1997: | A1 Module Flow Calibration |
| 09/15/1997: | Routine annual maintenance |
| 09/09/2001: | A1 Module Flow Calibration |
| 09/09/2001: | A1 Module pump replaced |
| 09/09/2001: | B1 Module Flow Calibration |
| 09/09/2001: | B1 Module pump replaced |
| 09/09/2001: | C1 Module Flow Calibration |
| 09/09/2001: | C1 Module pump replaced |
| 09/09/2001: | D1 Module Flow Calibration |
| 09/09/2001: | D1 Module pump replaced |
| 09/09/2001: | Routine annual maintenance |
| 09/09/2001: | Sampler controller replaced |
| 08/28/2002: | Sampler controller replaced |
| 08/26/2000: | offline until 10/21/2000 |
| 08/15/2002: | lot of smoke from fire this week |
| 08/13/2003: | Sampler controller replaced |
| 08/08/1995: | A1 Module Flow Calibration |
| 08/08/1995: | Routine annual maintenance |
| 08/04/2004: | B1 Module pump replaced |
| 07/31/2002: | high smoke concentration due to Oregon fire |
| 07/14/1998: | A1 Module pump replaced |
| 07/01/2004: | A1 Module Flow Calibration |
| 07/01/2004: | B1 Module Flow Calibration |
| 07/01/2004: | C1 Module Flow Calibration |
| 07/01/2004: | D1 Module Flow Calibration |
| 07/01/2004: | Photos taken |
| 07/01/2004: | Routine annual maintenance |
| 07/01/1998: | A1 Module Flow Calibration |
| 07/01/1998: | Routine annual maintenance |
| 06/28/1996: | A1 Module Flow Calibration |
| 06/28/1996: | A1 Module pump replaced |
| 06/28/1996: | Added glycerin to Module B1 denuder |
| 06/28/1996: | B1 Module pump replaced |
| 06/28/1996: | C1 Module pump replaced |
| 06/28/1996: | D1 Module pump replaced |
| 06/28/1996: | Routine annual maintenance |
| 06/25/2002: | A1 Module Flow Calibration |
| 06/25/2002: | A1 Module pump replaced |
| 06/25/2002: | B1 Module Flow Calibration |
| 06/25/2002: | B1 Module pump replaced |
| 06/25/2002: | C1 Module Flow Calibration |
| 06/25/2002: | D1 Module Flow Calibration |
| 06/25/2002: | Photos taken |
| 06/25/2002: | Routine annual maintenance |
| 05/14/2002: | D1 Module pump replaced |
| 05/04/2001: | Sampler controller replaced |
| 05/01/2002: | Sampler controller replaced |
| 04/23/2004: | B1 Module pump replaced |
| 04/21/2004: | A1 Module area increased from 2.20 to 3.53 sq cm |
| 01/14/2005: | C1 Module pump replaced |
| 01/12/2005: | B1 Module pump replaced |
| 01/12/2005: | D1 Module pump replaced |
| 01/12/1994: | A1 Module Flow Calibration |