Jarbidge Wilderness (JARB1)
Site Details
Country:United States
State:Nevada (pop. 1201833)
County:Elko County (pop. 33530)
Location2:Mahoney Forest Service Station, Jarbidge, NV
Latitude:41.8926
Longitude:-115.4261
Elevation:1869m above MSL
EPA Code:320079000
Agency:US Forest Service
Sponsor:USFS
Region:Great Basin
Land Use:Unknown
AQCR:None
Dates:3/1988 - Present
SiteID:68
SiteCode:JARB1
SiteName:Jarbidge Wilderness
Maps:Google, MSN, Yahoo
Site History
12/23/2003:D1 Module pump replaced
12/22/2004:A1 Module relay box replaced
12/22/2004:D1 Module relay box replaced
12/22/2004:Sampler controller replaced
11/26/2003:D1 offline until 12/26/2003
10/16/1996:A1 offline until 04/03/1997
10/15/1996:D1 Module flow Calibration
09/30/2003:A1 Module flow Calibration
09/30/2003:A1 Module pump replaced
09/30/2003:B1 Module flow Calibration
09/30/2003:C1 Module flow Calibration
09/30/2003:D1 Module flow Calibration
09/30/2003:D1 Module pump replaced
09/30/2003:Photos taken
09/30/2003:Routine annual maintenance
09/28/1994:A1 Module flow Calibration
09/28/1994:B1 Module flow Calibration
09/28/1994:C1 Module flow Calibration
09/28/1994:D1 Module flow Calibration
09/28/1994:Routine annual maintenance
09/13/2000:Temperature probe replaced
09/10/2001:A1 Module flow Calibration
09/10/2001:B1 Module flow Calibration
09/10/2001:C1 Module flow Calibration
09/10/2001:D1 Module flow Calibration
09/10/2001:Routine annual maintenance
09/06/1995:A1 Module flow Calibration
09/06/1995:B1 Module flow Calibration
09/06/1995:C1 Module flow Calibration
09/06/1995:D1 Module flow Calibration
09/06/1995:Routine annual maintenance
08/30/2000:A1 Module flow Calibration
08/30/2000:B1 Module flow Calibration
08/30/2000:C1 Module flow Calibration
08/30/2000:D1 Module flow Calibration
08/27/1997:C1 Module elapsed timer replaced
08/12/1997:A1 Module flow Calibration
08/12/1997:B1 Module flow Calibration
08/12/1997:C1 Module flow Calibration
08/12/1997:D1 Module flow Calibration
08/12/1997:Routine annual maintenance
07/29/2000:A1 Module flow Calibration
07/29/2000:C1 Module flow Calibration
07/29/2000:D1 Module flow Calibration
07/14/1998:A1 Module pump replaced
07/14/1998:B1 Module pump replaced
07/14/1998:C1 Module pump replaced
07/14/1998:D1 Module pump replaced
07/04/2002:A1 Module electronics box replaced
07/04/2002:A1 Module flow Calibration
07/04/2002:B1 Module flow Calibration
07/04/2002:B1 Module pump replaced
07/04/2002:C1 Module flow Calibration
07/04/2002:D1 Module flow Calibration
07/04/2002:Photos taken
07/04/2002:Routine annual maintenance
07/03/2000:Version 2 sampler installed
06/30/2004:A1 Module flow Calibration
06/30/2004:B1 Module flow Calibration
06/30/2004:C1 Module flow Calibration
06/30/2004:Calibrated collocated D1 Module
06/30/2004:D1 Module flow Calibration
06/30/2004:Installed collocated D1 Module
06/30/2004:Photos taken
06/30/2004:Routine annual maintenance
06/28/1994:Changed nylon filter size from 47mm diameter to 25mm
06/27/1998:A1 Module flow Calibration
06/27/1998:B1 Module flow Calibration
06/27/1998:C1 Module flow Calibration
06/27/1998:D1 Module flow Calibration
06/27/1998:Routine annual maintenance
06/26/1996:Added glycerin to Module B1 denuder
06/26/1996:B1 Module flow Calibration
06/26/1996:C1 Module flow Calibration
06/26/1996:D1 Module flow Calibration
06/26/1996:Routine annual maintenance
06/26/1996:A1 Module flow Calibration
06/17/2004:A1 Module area increased from 2.20 to 3.53 sq cm
04/30/1997:A1 Module elapsed timer replaced
04/30/1997:A1 Module magnhelic replaced
04/29/1997:A1 Module flow Calibration
04/19/2004:C1 Module pump replaced
04/06/1997:D1 Module flow Calibration
03/29/2000:offline until 05/03/2000
03/28/2000:A1 Module flow Calibration
03/28/2000:B1 Module flow Calibration
03/28/2000:C1 Module flow Calibration
03/28/2000:D1 Module flow Calibration
03/28/2000:Version 2 IMPROVE sampler installed
02/19/2004:C1 Module pump replaced
01/15/1998:C1 toggle switch replaced
01/05/2005:Sampler power outlets replaced