North Absaroka (NOAB1)
Site Details
Country:United States
State:Wyoming (pop. 453588)
County:Park County (pop. 23178)
Location2:Dead Indian Summit, NW of Cody, WY
Latitude:44.7448
Longitude:-109.3816
Elevation:2482m above MSL
EPA Code:560299002
Agency:US Forest Service
Sponsor:USFS
Region:Northern Rockies
Land Use:Unknown
AQCR:None
Dates:1/2000 - Present
SiteID:67
SiteCode:NOAB1
SiteName:North Absaroka
Maps:Google, MSN, Yahoo
Site History
10/24/2000:24V power supply replaced
10/24/2000:Temperature probe replaced
10/16/2003:Sampler controller replaced
09/27/2003:A1 Module Flow Calibration
09/27/2003:A1 Module pump replaced
09/27/2003:B1 Module Flow Calibration
09/27/2003:C1 Module Flow Calibration
09/27/2003:C1 Module pump replaced
09/27/2003:D1 Module Flow Calibration
09/27/2003:Photos taken
09/27/2003:Routine annual maintenance
09/21/2000:offline until 11/02/2000
09/12/2001:A1 Module Flow Calibration
09/12/2001:B1 Module Flow Calibration
09/12/2001:C1 Module Flow Calibration
09/12/2001:D1 Module Flow Calibration
09/12/2001:Routine annual maintenance
08/31/2000:D1 Module Flow Calibration
08/25/2000:A1 Module Flow Calibration
08/25/2000:B1 Module Flow Calibration
08/25/2000:C1 Module Flow Calibration
08/25/2000:D1 Module Flow Calibration
08/25/2000:Routine annual maintenance
08/22/2003:Fire smoke continues
08/13/2003:Large amount of smoke for past 2 weeks due to fire
07/19/2001:Sampler controller replaced
07/17/2003:Fire in area
06/30/2002:C1 Module Flow Calibration
06/30/2002:D1 Module Flow Calibration
06/30/2002:Photos taken
06/30/2002:Routine annual maintenance
06/30/2002:A1 Module Flow Calibration
06/30/2002:A1 Module pump replaced
06/30/2002:B1 Module Flow Calibration
06/30/2002:B1 Module pump replaced
06/27/2000:Sampler controller replaced
06/26/2004:A1 Module Flow Calibration
06/26/2004:B1 Module Flow Calibration
06/26/2004:C1 Module Flow Calibration
06/26/2004:D1 Module Flow Calibration
06/26/2004:Photos taken
06/26/2004:Routine annual maintenance
06/08/2001:Sampler controller replaced
05/23/2000:Version 2 sampler installed
05/20/2003:Sampler controller replaced
05/20/2002:A1 Module Flow Calibration
05/20/2002:Routine annual maintenance
04/27/2004:C1 Module pump replaced
02/27/2001:C1 Module electronics box replaced
01/25/2000:New IMPROVE site, version 2 sampler installed
01/25/2000:A1 Module Flow Calibration
01/25/2000:B1 Module Flow Calibration
01/25/2000:C1 Module Flow Calibration
01/25/2000:D1 Module Flow Calibration