Bridger Wilderness (BRID1)
Site Details
Country:United States
State:Wyoming (pop. 453588)
County:Sublette County (pop. 4843)
Location2:White Pine ski area 10 miles E of Pinedale, WY, near Fremont Lake
Latitude:42.9749
Longitude:-109.7579
Elevation:2626m above MSL
EPA Code:560359000
Agency:US Forest Service
Sponsor:USFS
Region:Northern Rockies
Land Use:Unknown
AQCR:None
Dates:3/1988 - Present
SiteID:65
SiteCode:BRID1
SiteName:Bridger Wilderness
Maps:Google, MSN, Yahoo
Site History
12/23/1996:D1 Module Flow Calibration
12/11/1999:Prescribed fire near site
12/08/1999:Prescribed fire near site
12/01/1999:Prescribed fire near site
11/30/1999:A1 Module Flow Calibration
11/30/1999:B1 Module Flow Calibration
11/30/1999:C1 Module Flow Calibration
11/30/1999:D1 Module Flow Calibration
11/30/1999:Version 2 sampler installed
11/23/1999:Prescribed fire near site
11/19/1999:Version 2 IMPROVE sampler installed
10/29/2002:Prescribed fire near site
10/26/2002:Prescribed fire near site
10/23/2002:Prescribed fire near site
10/11/2003:Bulldozing near site
10/09/1996:Fire burning 6 miles SW of site
09/30/1997:B1 Module pump replaced
09/28/2003:A1 Module Flow Calibration
09/28/2003:A1 Module pump replaced
09/28/2003:B1 Module Flow Calibration
09/28/2003:C1 Module electronics box replaced
09/28/2003:C1 Module Flow Calibration
09/28/2003:C1 Module pump replaced
09/28/2003:D1 Module Flow Calibration
09/28/2003:Photos taken
09/28/2003:Routine annual maintenance
09/27/1995:Local burning at construction site down hill 1/8 mile east
09/20/2002:Logging operation near site causing dust
09/18/2003:Logging operation near site
09/11/2001:B1 Module Flow Calibration
09/11/2001:C1 Module Flow Calibration
09/11/2001:D1 Module Flow Calibration
09/11/2001:Photos taken
09/11/2001:Routine annual maintenance
09/11/2001:A1 Module Flow Calibration
09/10/1995:A1 Module Flow Calibration
09/10/1995:B1 Module Flow Calibration
09/10/1995:C1 Module Flow Calibration
09/10/1995:D1 Module Flow Calibration
09/10/1995:Routine annual maintenance
09/06/2000:A1 Module electronics box replaced
09/06/2000:B1 Module electronics box replaced
09/06/2000:C1 Module electronics box replaced
09/06/2000:D1 Module electronics box replaced
08/23/2000:A1 Module Flow Calibration
08/23/2000:B1 Module Flow Calibration
08/23/2000:C1 Module Flow Calibration
08/23/2000:D1 Module Flow Calibration
08/23/2000:Photos taken
08/23/2000:Routine annual maintenance
08/15/1997:A1 Module Flow Calibration
08/15/1997:B1 Module Flow Calibration
08/15/1997:C1 Module Flow Calibration
08/15/1997:D1 Module Flow Calibration
08/15/1997:Routine annual maintenance
08/14/1996:Haze from fire SW of sampling site
08/13/2003:log skidding on hill near site
08/07/1996:Haze from fire SW of sampling site
08/07/1994:A1 Module Flow Calibration
08/07/1994:A1 Module pump Repalced
08/07/1994:B1 Module Flow Calibration
08/07/1994:C1 Module Flow Calibration
08/07/1994:D1 Module Flow Calibration
08/07/1994:Routine annual maintenance
07/19/2002:Diesel skidder and chain saws operating close to site
07/19/2002:Ski run construction in progress
07/17/2003:lots of drift smoke from area fire
07/16/2002:Sampler controller replaced
07/14/2003:Smoke from East Table Fire in valley
07/08/2003:Fire started 7/12/03
07/04/1998:Prescribed fire near site
07/03/1996:A1 Module Flow Calibration
07/03/1996:A1 Module pump replaced
07/03/1996:Added glycerin to Module B1 denuder
07/03/1996:B1 Module Flow Calibration
07/03/1996:C1 Module Flow Calibration
07/03/1996:D1 Module Flow Calibration
07/03/1996:Routine annual maintenance
07/02/2002:A1 Module Flow Calibration
07/02/2002:A1 Module pump replaced
07/02/2002:B1 Module Flow Calibration
07/02/2002:B1 Module pump replaced
07/02/2002:C1 Module Flow Calibration
07/02/2002:D1 Module Flow Calibration
07/02/2002:Photos taken
07/02/2002:Routine annual maintenance
07/02/1997:chainsaws and skidders operating within 1/4 mile of site this week
06/29/1998:A1 Module pump Replaced
06/29/1998:B1 Module pump Replaced
06/29/1998:C1 Module pump Replaced
06/29/1998:D1 Module pump Replaced
06/29/1998:Routine annual maintenance
06/28/2004:A1 Module Flow Calibration
06/28/2004:B1 Module Flow Calibration
06/28/2004:C1 Module Flow Calibration
06/28/2004:D1 Module Flow Calibration
06/28/2004:Photos taken
06/28/2004:Routine annual maintenance
06/28/1994:Changed nylon filter size from 47mm diameter to 25mm
06/27/1998:A1 Module Flow Calibration
06/27/1998:B1 Module Flow Calibration
06/27/1998:C1 Module Flow Calibration
06/27/1998:D1 Module Flow Calibration
06/25/1997:Skidder andchainsaw activity within 200 yards of IMPROVE site
06/11/1997:chainsaws and skidders operating within 1/4 mile of site this week
06/04/1997:Chainsaw and Skidder activity near site and new roads cleared at Ski Area
05/24/2000:Prescribed fire near site
05/22/2001:Prescribed fire near site
05/17/2000:Prescribed fire near site
05/08/1996:ranchers burning fields and ditches noticable haze all week
05/03/2000:Prescribed fire near site
03/04/2003:B1 Module pump replaced
02/12/1997:D1 Module Flow Calibration
02/11/1998:Prescribed fire near site
01/20/2005:Sampler removed collocated PM10