White River NF (WHRI1)
Site Details
Country:United States
State:Coahuila
County:Garfield County (pop. 29974)
Location2:USFS Communication Facility, at Tourtellotte Park, Aspen Mt. Ski Area, Aspen, CO
Latitude:39.1536
Longitude:-106.8209
Elevation:3413m above MSL
EPA Code:080979000
Agency:US Forest Service
Sponsor:USFS
Region:Central Rockies
Land Use:Unknown
AQCR:None
Dates:7/1993 - Present
SiteID:56
SiteCode:WHRI1
SiteName:White River NF
Maps:Google, MSN, Yahoo
Site History
11/21/2000:Sampler controller replaced
10/30/2003:CA fire smoke prevelant today
10/29/2003:PM10 inlet replaced
10/24/2000:Temperature probe replaced
10/21/2002:A1 Module pump replaced
10/21/2002:A1 Module replaced
10/21/2002:B1 Module pump replaced
10/21/2002:B1 Module replaced
10/21/2002:C1 Module replaced
10/21/2002:D1 Module replaced
10/21/2002:Relocated site in Round Fiberglass Structure 10 ft away
10/21/2002:Routine annual maintenance
10/16/2002:A1 Module Flow Calibration
10/16/2002:B1 Module Flow Calibration
10/16/2002:C1 Module Flow Calibration
10/16/2002:D1 Module Flow Calibration
09/30/1997:A1 Module elapsed timer replaced
09/18/2001:Sampler controller replaced
09/14/1995:A1 Module Flow Calibration
09/14/1995:Routine annual maintenance
09/03/1999:Version 2 IMPROVE sampler installed
09/01/1999:A1 Module Flow Calibration
08/28/1996:A lot of smoke
08/25/2004:Fire this week SW colorado and utah make skies hazy
08/22/1997:A1 Module Flow Calibration
08/21/1997:Routine annual maintenance
08/20/2004:A1 Module Flow Calibration
08/20/2004:B1 Module Flow Calibration
08/20/2004:C1 Module Flow Calibration
08/20/2004:D1 Module Flow Calibration
08/20/2004:Photos taken
08/20/2004:Routine annual maintenance
08/18/2001:A1 Module Flow Calibration
08/18/2001:A1 Module relay box replaced
08/18/2001:B1 Module Flow Calibration
08/18/2001:B1 Module replaced
08/18/2001:C1 Module electronics box replaced
08/18/2001:C1 Module Flow Calibration
08/18/2001:D1 Module Flow Calibration
08/18/2001:Photos taken
08/18/2001:Routine annual maintenance
08/18/2001:Sampler controller replaced
08/08/2003:A1 Module Flow Calibration
08/08/2003:B1 Module Flow Calibration
08/08/2003:C1 Module Flow Calibration
08/08/2003:C1 Module pump replaced
08/08/2003:D1 Module Flow Calibration
08/08/2003:D1 Module pump replaced
08/08/2003:Photos taken
08/08/2003:Routine annual maintenance
08/06/1996:A1 Module elapsed timer replaced
07/17/2001:Sampler controller replaced
07/17/1994:A1 Module Flow Calibration
07/07/1996:A1 Module elapsed timer replaced
07/07/1996:A1 Module Flow Calibration
07/07/1996:A1 Module pump replaced
07/07/1996:Added glycerin to Module B1 denuder
07/07/1996:B1 Module pump replaced
07/07/1996:C1 Module pump replaced
07/07/1996:D1 Module pump replaced
07/07/1996:Routine annual maintenance
05/24/2001:A1 Module electronics box replaced
05/24/2001:Sampler controller replaced
05/21/2001:A1 Module pump replaced
05/07/2002:A1 Module pump replaced
04/28/2000:A1 Module Flow Calibration
04/28/2000:B1 Module Flow Calibration
04/28/2000:C1 Module Flow Calibration
04/25/2001:A1 Module cable replaced
04/05/2002:A1 Module Flow Calibration
04/02/2002:Sampler controller replaced
03/17/2004:D1 Module pump replaced
03/06/2002:offline until 04/05/2002
02/28/2000:D1 Module Flow Calibration
02/13/2001:A1 Module electronics box replaced
02/13/2001:A1 Module Flow Calibration
02/13/2001:B1 Module Flow Calibration
02/13/2001:C1 Module Flow Calibration
02/13/2001:D1 Module Flow Calibration
02/03/2000:A1 Module Flow Calibration
02/03/2000:B1 Module Flow Calibration
02/03/2000:C1 Module Flow Calibration
02/03/2000:Version 2 sampler installed
  
  
White River NF (WHRI1)
Site Details
Country:United States
State:Colorado (pop. 3294394)
County:Garfield County (pop. 29974)
Location2:USFS Communication Facility, at Tourtellotte Park, Aspen Mt. Ski Area, Aspen, CO
Latitude:39.1536
Longitude:-106.8209
Elevation:3413m above MSL
EPA Code:080979000
Agency:US Forest Service
Sponsor:USFS
Region:Central Rockies
Land Use:Unknown
AQCR:None
Dates:7/1993 - Present
SiteID:56
SiteCode:WHRI1
SiteName:White River NF
Maps:Google, MSN, Yahoo
Site History
11/21/2000:Sampler controller replaced
10/30/2003:CA fire smoke prevelant today
10/29/2003:PM10 inlet replaced
10/24/2000:Temperature probe replaced
10/21/2002:A1 Module pump replaced
10/21/2002:A1 Module replaced
10/21/2002:B1 Module pump replaced
10/21/2002:B1 Module replaced
10/21/2002:C1 Module replaced
10/21/2002:D1 Module replaced
10/21/2002:Relocated site in Round Fiberglass Structure 10 ft away
10/21/2002:Routine annual maintenance
10/16/2002:A1 Module Flow Calibration
10/16/2002:B1 Module Flow Calibration
10/16/2002:C1 Module Flow Calibration
10/16/2002:D1 Module Flow Calibration
09/30/1997:A1 Module elapsed timer replaced
09/18/2001:Sampler controller replaced
09/14/1995:A1 Module Flow Calibration
09/14/1995:Routine annual maintenance
09/03/1999:Version 2 IMPROVE sampler installed
09/01/1999:A1 Module Flow Calibration
08/28/1996:A lot of smoke
08/25/2004:Fire this week SW colorado and utah make skies hazy
08/22/1997:A1 Module Flow Calibration
08/21/1997:Routine annual maintenance
08/20/2004:A1 Module Flow Calibration
08/20/2004:B1 Module Flow Calibration
08/20/2004:C1 Module Flow Calibration
08/20/2004:D1 Module Flow Calibration
08/20/2004:Photos taken
08/20/2004:Routine annual maintenance
08/18/2001:A1 Module Flow Calibration
08/18/2001:A1 Module relay box replaced
08/18/2001:B1 Module Flow Calibration
08/18/2001:B1 Module replaced
08/18/2001:C1 Module electronics box replaced
08/18/2001:C1 Module Flow Calibration
08/18/2001:D1 Module Flow Calibration
08/18/2001:Photos taken
08/18/2001:Routine annual maintenance
08/18/2001:Sampler controller replaced
08/08/2003:A1 Module Flow Calibration
08/08/2003:B1 Module Flow Calibration
08/08/2003:C1 Module Flow Calibration
08/08/2003:C1 Module pump replaced
08/08/2003:D1 Module Flow Calibration
08/08/2003:D1 Module pump replaced
08/08/2003:Photos taken
08/08/2003:Routine annual maintenance
08/06/1996:A1 Module elapsed timer replaced
07/17/2001:Sampler controller replaced
07/17/1994:A1 Module Flow Calibration
07/07/1996:A1 Module elapsed timer replaced
07/07/1996:A1 Module Flow Calibration
07/07/1996:A1 Module pump replaced
07/07/1996:Added glycerin to Module B1 denuder
07/07/1996:B1 Module pump replaced
07/07/1996:C1 Module pump replaced
07/07/1996:D1 Module pump replaced
07/07/1996:Routine annual maintenance
05/24/2001:A1 Module electronics box replaced
05/24/2001:Sampler controller replaced
05/21/2001:A1 Module pump replaced
05/07/2002:A1 Module pump replaced
04/28/2000:A1 Module Flow Calibration
04/28/2000:B1 Module Flow Calibration
04/28/2000:C1 Module Flow Calibration
04/25/2001:A1 Module cable replaced
04/05/2002:A1 Module Flow Calibration
04/02/2002:Sampler controller replaced
03/17/2004:D1 Module pump replaced
03/06/2002:offline until 04/05/2002
02/28/2000:D1 Module Flow Calibration
02/13/2001:A1 Module electronics box replaced
02/13/2001:A1 Module Flow Calibration
02/13/2001:B1 Module Flow Calibration
02/13/2001:C1 Module Flow Calibration
02/13/2001:D1 Module Flow Calibration
02/03/2000:A1 Module Flow Calibration
02/03/2000:B1 Module Flow Calibration
02/03/2000:C1 Module Flow Calibration
02/03/2000:Version 2 sampler installed