Site Details |
| Country: | United States |
| State: | Colorado (pop. 3294394) |
| County: | La Plata County (pop. 32284) |
| Location2: | USFS fire station 30 miles N of Durango 1 mile N of Purgatory Ski Area |
| Latitude: | 37.6594 |
| Longitude: | -107.7999 |
| Elevation: | 2750m above MSL |
| EPA Code: | 081119000 |
| Agency: | US Forest Service |
| Sponsor: | USFS |
| Region: | Colorado Plateau |
| Land Use: | Unknown |
| AQCR: | None |
| Dates: | 3/1988 - Present |
| SiteID: | 55 |
| SiteCode: | WEMI1 |
| SiteName: | Weminuche Wilderness |
| Maps: | Google, MSN, Yahoo |
Site History |
| 10/30/2003: | smoke from California fire was very heavy |
| 10/02/1999: | smoke from fire in the west drifted into area |
| 10/01/1998: | A1 Module pump replaced |
| 10/01/1998: | B1 Module pump replaced |
| 10/01/1998: | C1 Module pump replaced |
| 10/01/1998: | D1 Module pump replaced |
| 09/23/1998: | Routine annual maintenance |
| 09/22/1998: | A1 Module Flow Calibration |
| 09/22/1998: | B1 Module Flow Calibration |
| 09/22/1998: | C1 Module Flow Calibration |
| 09/22/1998: | D1 Module Flow Calibration |
| 09/19/1995: | A1 Module Flow Calibration |
| 09/19/1995: | B1 Module Flow Calibration |
| 09/19/1995: | C1 Module Flow Calibration |
| 09/19/1995: | D1 Module Flow Calibration |
| 09/19/1995: | Routine annual maintenance |
| 08/28/2000: | A1 Module Flow Calibration |
| 08/28/2000: | B1 Module Flow Calibration |
| 08/28/2000: | C1 Module Flow Calibration |
| 08/28/2000: | D1 Module Flow Calibration |
| 08/26/2003: | A1 Module pump replaced |
| 08/26/2003: | B1 Module pump replaced |
| 08/26/2003: | D1 Module inlet replaced |
| 08/19/2002: | A1 Module Flow Calibration |
| 08/19/2002: | B1 Module Flow Calibration |
| 08/19/2002: | C1 Module Flow Calibration |
| 08/19/2002: | D1 Module Flow Calibration |
| 08/19/2002: | Photos taken |
| 08/19/2002: | Routine annual maintenance |
| 08/18/2004: | A1 Module Flow Calibration |
| 08/18/2004: | B1 Module Flow Calibration |
| 08/18/2004: | C1 Module Flow Calibration |
| 08/18/2004: | D1 Module Flow Calibration |
| 08/18/2004: | Photos taken |
| 08/18/2004: | Routine annual maintenance |
| 08/17/2001: | Routine annual maintenance |
| 08/17/2001: | A1 Module Flow Calibration |
| 08/17/2001: | B1 Module Flow Calibration |
| 08/17/2001: | C1 Module Flow Calibration |
| 08/17/2001: | D1 Module Flow Calibration |
| 08/17/2001: | Photos taken |
| 08/09/2003: | A1 Module Flow Calibration |
| 08/09/2003: | B1 Module Flow Calibration |
| 08/09/2003: | C1 D1 Module pumps swapped |
| 08/09/2003: | C1 Module Flow Calibration |
| 08/09/2003: | D1 Module Flow Calibration |
| 08/09/2003: | Photos taken |
| 08/09/2003: | Routine annual maintenance |
| 07/24/1997: | A1 Module Flow Calibration |
| 07/24/1997: | B1 Module Flow Calibration |
| 07/24/1997: | C1 Module Flow Calibration |
| 07/24/1997: | D1 Module Flow Calibration |
| 07/24/1997: | Routine annual maintenance |
| 07/14/2003: | local fire and dust from continued drought |
| 07/12/1994: | A1 Module Flow Calibration |
| 07/12/1994: | A1 Module pump replaced |
| 07/12/1994: | B1 Module Flow Calibration |
| 07/12/1994: | B1 Module pump replaced |
| 07/12/1994: | C1 Module Flow Calibration |
| 07/12/1994: | C1 Module pump replaced |
| 07/12/1994: | D1 Module Flow Calibration |
| 07/12/1994: | D1 Module pump replaced |
| 07/12/1994: | Routine annual maintenance |
| 07/12/1994: | Valve installed |
| 07/08/1996: | A1 Module Flow Calibration |
| 07/08/1996: | A1 Module pump replaced |
| 07/08/1996: | Added glycerin to Module B1 denuder |
| 07/08/1996: | B1 Module Flow Calibration |
| 07/08/1996: | B1 Module pump replaced |
| 07/08/1996: | C1 Module Flow Calibration |
| 07/08/1996: | C1 Module pump replaced |
| 07/08/1996: | D1 Module Flow Calibration |
| 07/08/1996: | D1 Module pump replaced |
| 06/28/1994: | Changed nylon filter size from 47mm diameter to 25mm |
| 06/07/2002: | large fire within 10 miles of this location until 07/10/2002 |
| 06/07/2000: | major fire upwind of site this week past |
| 05/09/2000: | Version 2 IMPROVE sampler installed |
| 05/06/1998: | Prescribed fire being conducted in area |
| 04/27/2000: | A1 Module Flow Calibration |
| 04/27/2000: | B1 Module Flow Calibration |
| 04/27/2000: | C1 Module Flow Calibration |
| 04/27/2000: | D1 Module Flow Calibration |
| 04/27/2000: | Version 2 sampler installed |
| 02/08/1996: | Routine annual maintenance |
| 01/30/2004: | D1 Module pump replaced |
| 01/12/2000: | offline until 02/23/2000 |