Ike's Backbone (IKBA1)
Site Details
Country:United States
State:Arizona (pop. 3665228)
County:Yavapai County (pop. 107714)
Latitude:34.3405
Longitude:-111.6832
Elevation:1297m above MSL
EPA Code:040258104
Agency:US Forest Service
Sponsor:USFS
Region:Mogollon Plateau
Land Use:Unknown
AQCR:None
Dates:4/2000 - Present
SiteID:46
SiteCode:IKBA1
SiteName:Ike's Backbone
Maps:Google, MSN, Yahoo
Site History
12/04/2001:A1 transducer replaced
09/07/2000:A1 Module flow Calibration
09/07/2000:B1 Module flow Calibration
09/07/2000:C1 Module flow Calibration
09/07/2000:D1 Module flow Calibration
07/18/2001:Fire on Pine Mt. Approx. 5,000 Acre.
06/29/2004:Fire 7 miles SE from site
05/24/2004:A1 Module flow Calibration
05/24/2004:B1 Module flow Calibration
05/24/2004:C1 Module flow Calibration
05/24/2004:D1 Module flow Calibration
05/24/2004:Photos taken
05/24/2004:Routine annual maintenance
04/02/2000:New IMPROVE site, version 2 sampler installed
03/28/2002:A1 Module flow Calibration
03/28/2002:A1 Module pump replaced
03/28/2002:B1 Module flow Calibration
03/28/2002:B1 Module pump replaced
03/28/2002:B1 Module replaced
03/28/2002:C1 Module flow Calibration
03/28/2002:D1 Module flow Calibration
03/28/2002:Photos taken
03/28/2002:Routine annual maintenance
03/28/2000:A1 Module flow Calibration
03/28/2000:B1 Module flow Calibration
03/28/2000:C1 Module flow Calibration
03/28/2000:D1 Module flow Calibration
03/28/2000:Version 2 sampler installed
03/26/2003:A1 Module flow Calibration
03/26/2003:A1 Module pump replaced
03/26/2003:B1 Module flow Calibration
03/26/2003:B1 Module pump replaced
03/26/2003:C1 Module flow Calibration
03/26/2003:C1 Module pump replaced
03/26/2003:D1 Module flow Calibration
03/26/2003:D1 Module pump replaced
03/26/2003:Photos taken
03/26/2003:Routine annual maintenance
03/23/2005:A1 Module Flow Calibration
03/23/2005:B1 Module flow Calibration
03/23/2005:C1 Module flow Calibration
03/23/2005:D1 Module flow Calibration
03/23/2005:Routine annual maintenance
03/04/2004:A1 Module area increased from 2.20 to 3.53 sq cm
02/26/2002:A1 Module electronics box replaced
02/01/2002:Sampler controller replaced
01/05/2004:C1 Module pump replaced
01/03/2002:A1 Module electronics box replaced