Tonto NM (TONT1)
Site Details
Country:United States
State:Arizona (pop. 3665228)
County:Gila County (pop. 40216)
Location2:Next to maintenance building
Latitude:33.6548
Longitude:-111.1068
Elevation:775m above MSL
EPA Code:040070010
Agency:US Forest Service
Sponsor:NPS
Region:Mogollon Plateau
Land Use:Unknown
AQCR:None
Dates:4/1988 - Present
SiteID:44
SiteCode:TONT1
SiteName:Tonto NM
Maps:Google, MSN, Yahoo
Site History
12/25/1999:offline until 02/16/2000
12/15/2004:A1 Module hose to pump relaced
12/15/2004:B1 Module hose to pump relaced
12/15/2004:C1 Module hose to pump relaced
12/15/2004:D1 Module hose to pump relaced
12/10/2004:A1 Module Flow Calibration
12/10/2004:B1 Module Flow Calibration
12/10/2004:C1 Module Flow Calibration
12/10/2004:D1 Module Flow Calibration
12/10/2004:Routine annual maintenance
12/10/2001:A1 Module Flow Calibration
12/10/2001:B1 Module Flow Calibration
12/10/2001:C1 Module Flow Calibration
12/10/2001:D1 Module Flow Calibration
12/09/1997:D1 Module Flow Calibration
11/24/1997:C1 Module Flow Calibration
11/22/1995:Prescribed fire in area this week
11/19/1997:constuction nearby
11/15/2004:D1 Module electronics box replaced
11/15/2004:Sampler controller replaced
11/15/1995:Prescribed fire for last 10 days near monument
11/12/1997:Prescribed fire
11/10/1999:fire
11/09/1996:Heavy smoke in area from fire
11/05/1997:Prescribed fire and construction near sampler.
10/29/1997:Large prescribed fire
10/27/1999:Prescribed fire this week
10/22/1997:Prescribed fire
10/20/1999:Three prescribed fires in area for past week poor visibility
10/15/1997:Large prescribed fire
10/11/2002:road construction and prescribed fire
10/01/1998:A1 Module pump replaced
10/01/1998:B1 Module pump replaced
10/01/1998:C1 Module pump replaced
10/01/1998:Cyclones replaced
10/01/1998:D1 Module magnehelic replaced
10/01/1998:D1 Module pump replaced
10/01/1998:Denuder replaced
10/01/1998:Surge protector installed
09/20/1995:Prescribed fire 3 miles away from monument
09/10/1997:open ditch next to station
09/06/2000:A1 Module Flow Calibration
09/06/2000:B1 Module Flow Calibration
09/06/2000:C1 Module Flow Calibration
09/06/2000:D1 Module Flow Calibration
09/05/2002:road construction for the next year or so
09/03/1998:A1 Module Flow Calibration
09/03/1998:B1 Module Flow Calibration
09/03/1998:C1 Module Flow Calibration
09/03/1998:D1 Module Flow Calibration
09/03/1998:Routine annual maintenance
09/02/2003:Sampler controller replaced
08/27/1997:There's an excavation approx. 20 feet away from site
08/14/2004:D1 Module pump replaced
08/13/2003:building hit by lightening
07/16/2004:Sampler controller replaced
07/10/1994:A1 Module Flow Calibration
07/10/1994:B1 Module Flow Calibration
07/10/1994:C1 Module Flow Calibration
07/10/1994:D1 Module Flow Calibration
07/10/1994:Routine annual maintenance
07/09/2004:D1 Module pump replaced
07/01/1995:Two large fires occurring near the monument this week
06/28/1994:Changed nylon filter size from 47mm diameter to 25mm
06/21/1995:Prescribed fire in area
06/19/2002:smoke next two weeks
06/14/1995:15 acre fire within 7 miles of monument
06/06/1998:200 acre fire 2 miles from monument
05/20/1998:lots of smoke from Mexico fire
05/17/1995:A1 Module Flow Calibration
05/17/1995:B1 Module Flow Calibration
05/17/1995:C1 Module Flow Calibration
05/17/1995:D1 Module Flow Calibration
05/17/1995:Routine annual maintenance
05/13/1998:A1 Module Flow Calibration
05/08/2002:Sampler controller replaced
05/08/1996:still some smoke from Lone Fire hot spots
05/01/1996:fire, 61370 acres continues this week
04/24/1996:fire 8 miles W start 4/27. 15000+ acre. out of control by 4/29/96
04/21/2004:A1 Module area increased from 2.20 to 3.53 sq cm
04/03/2000:Version 2 IMPROVE sampler installed
04/03/2000:A1 Module Flow Calibration
04/03/2000:B1 Module Flow Calibration
04/03/2000:C1 Module Flow Calibration
04/03/2000:D1 Module Flow Calibration
04/03/2000:Version 2 sampler installed
04/03/1996:Added glycerin to Module B1 denuder
04/03/1996:B1 Module Flow Calibration
04/03/1996:B1 Module pump replaced
04/03/1996:C1 Module Flow Calibration
04/03/1996:C1 Module pump replaced
04/03/1996:D1 Module Flow Calibration
04/03/1996:D1 Module magnehelic replaced
04/03/1996:D1 Module pump replaced
04/03/1996:Routine annual maintenance
04/03/1996:A1 Module Flow Calibration
04/03/1996:A1 Module pump replaced
03/27/2004:C1 Module electronics box replaced
03/27/2004:C1 Module Flow Calibration
03/27/2004:C1 Module pump replaced
03/27/2004:D1 Module electronics box replaced
03/27/2004:D1 Module Flow Calibration
03/27/2004:D1 Module pump replaced
03/27/2004:Photos taken
03/27/2004:Routine annual maintenance
03/27/2004:A1 Module electronics box replaced
03/27/2004:A1 Module Flow Calibration
03/27/2004:A1 Module motor replaced
03/27/2004:B1 Module electronics box replaced
03/27/2004:B1 Module Flow Calibration
03/27/2004:B1 Module pump replaced
03/27/2003:A1 Module Flow Calibration
03/27/2003:A1 Module pump replaced
03/27/2003:B1 Module Flow Calibration
03/27/2003:B1 Module pump replaced
03/27/2003:C1 Module Flow Calibration
03/27/2003:D1 Module Flow Calibration
03/27/2003:Photos taken
03/27/2003:Routine annual maintenance
03/27/1994:A1 Module Flow Calibration
03/27/1994:B1 Module Flow Calibration
03/27/1994:C1 Module Flow Calibration
03/27/1994:D1 Module Flow Calibration
03/27/1994:Routine annual maintenance
03/25/2002:A1 Module Flow Calibration
03/25/2002:A1 Module pump replaced
03/25/2002:B1 Module Flow Calibration
03/25/2002:B1 Module pump replaced
03/25/2002:C1 Module Flow Calibration
03/25/2002:D1 Module Flow Calibration
03/25/2002:Photos taken
03/25/2002:Routine annual maintenance
03/25/1997:A1 Module Flow Calibration
03/25/1997:B1 Module Flow Calibration
03/25/1997:C1 Module Flow Calibration
03/25/1997:D1 Module Flow Calibration
03/25/1997:Routine annual maintenance
03/18/1998:Open house over 1000 cars
02/15/2000:D1 Module pump replaced
02/15/2000:Sampler controller clock replaced
02/14/1996:Prescribed fire in area for over a week
02/13/2002:heavy construction next two weeks
02/08/2004:Sampler controller replaced
01/28/2004:A1 Module pump replaced