Great Gulf Wilderness (GRGU1)
Site Details
Country:United States
State:New Hampshire (pop. 1109252)
County:Coos County (pop. 34828)
Location2:Camp Dodge, White Mt NF, S of Gorham, NH
Latitude:44.3082
Longitude:-71.2177
Elevation:453m above MSL
EPA Code:330074002
Agency:US Forest Service
Sponsor:USFS
Region:Northeast
Land Use:Unknown
AQCR:None
Dates:6/1995 - Present
SiteID:4
SiteCode:GRGU1
SiteName:Great Gulf Wilderness
Maps:Google, MSN, Yahoo
Site History
10/19/2004:B1 Module electronics box replaced
10/09/1997:A1 Module Flow Calibration
10/09/1997:B1 Module Flow Calibration
10/09/1997:C1 Module Flow Calibration
10/09/1997:D1 Module Flow Calibration
10/09/1997:Routine annual maintenance
09/30/2001:A1 Module Flow Calibration
09/30/2001:B1 Module Flow Calibration
09/30/2001:C1 Module Flow Calibration
09/30/2001:D1 Module Flow Calibration
09/30/2001:Photos Taken
09/30/2001:Routine annual maintenance
09/21/2000:A1 Module Flow Calibration
09/21/2000:B1 Module Flow Calibration
09/21/2000:C1 Module Flow Calibration
09/21/2000:D1 Module Flow Calibration
09/21/2000:Routine annual maintenance
09/16/2002:A1 Module Flow Calibration
09/16/2002:A1 Module pump replaced
09/16/2002:B1 Module Flow Calibration
09/16/2002:B1 Module pump replaced
09/16/2002:C1 Module Flow Calibration
09/16/2002:D1 Module Flow Calibration
09/16/2002:Photos Taken
09/16/2002:Routine annual maintenance
09/02/2003:A1 Module Flow Calibration
09/02/2003:B1 Module Flow Calibration
09/02/2003:C1 Module Flow Calibration
09/02/2003:D1 Module Flow Calibration
09/02/2003:Photos Taken
09/02/2003:Routine annual maintenance
09/02/2002:A1 Module pump replaced
09/02/2002:B1 Module pump replaced
08/28/1996:Added glycerin to Module B1 denuder
08/28/1996:B1 Module Flow Calibration
08/28/1996:B1 Module pump Replaced
08/28/1996:C1 Module Flow Calibration
08/28/1996:C1 Module pump Replaced
08/28/1996:D1 Module Flow Calibration
08/28/1996:D1 Module pump Replaced
08/28/1996:Routine annual maintenance
08/28/1996:A1 Module Flow Calibration
08/28/1996:A1 Module pump Replaced
08/22/1995:A1 Module Flow Calibration
08/22/1995:B1 Module Flow Calibration
08/22/1995:C1 Module Flow Calibration
08/22/1995:D1 Module Flow Calibration
08/22/1995:Routine annual maintenance
08/22/1994:A1 Module Flow Calibration
08/22/1994:B1 Module Flow Calibration
08/22/1994:C1 Module Flow Calibration
08/22/1994:D1 Module Flow Calibration
08/22/1994:Routine annual maintenance
08/16/2001:D1 Module pump Replaced
07/21/2004:A1 Module Flow Calibration
07/21/2004:B1 Module Flow Calibration
07/21/2004:C1 Module Flow Calibration
07/21/2004:D1 Module Flow Calibration
07/21/2004:Photos Taken
07/21/2004:Routine annual maintenance
06/10/2000:Routine annual maintenance
06/03/2000:A1 Module area increased from 2.20 to 3.53 sq cm
05/24/2000:Version 2 IMPROVE sampler installed
05/23/2000:A1 Module Flow Calibration
05/23/2000:B1 Module Flow Calibration
05/23/2000:C1 Module Flow Calibration
05/23/2000:D1 Module Flow Calibration
05/23/2000:Version 2 sampler installed
05/19/1998:A1 Module Flow Calibration
05/19/1998:B1 Module Flow Calibration
05/19/1998:C1 Module Flow Calibration
05/19/1998:D1 Module Flow Calibration
05/19/1998:Routine annual maintenance
04/11/2003:Sampler controller replaced