Wheeler Peak (WHPE1)
Site Details
Country:United States
State:New Mexico (pop. 1515069)
County:Taos County (pop. 23118)
Latitude:36.5854
Longitude:-105.452
Elevation:3366m above MSL
EPA Code:350559000
Agency:US Forest Service
Sponsor:USFS
Region:Central Rockies
Land Use:Unknown
AQCR:None
Dates:8/2000 - Present
SiteID:35
SiteCode:WHPE1
SiteName:Wheeler Peak
Maps:Google, MSN, Yahoo
Site History
10/11/2001:Sampler controller replaced
10/05/2004:A1 Module cables replaced
10/05/2004:B1 Module cables replaced
09/03/2000:offline until 10/09/2000
09/02/2004:Sampler controller replaced
09/02/2003:A1 Module Flow Calibration
09/02/2003:B1 Module Flow Calibration
09/02/2003:C1 Module Flow Calibration
09/02/2003:D1 Module Flow Calibration
09/02/2003:Photos taken
09/02/2003:Routine annual maintenance
08/21/2001:A1 Module Flow Calibration
08/21/2001:B1 Module Flow Calibration
08/21/2001:C1 Module Flow Calibration
08/21/2001:D1 Module Flow Calibration
08/21/2001:Photos taken
08/21/2001:Routine annual maintenance
08/20/2004:Routine annual maintenance
08/20/2002:Routine annual maintenance
08/20/2002:A1 Module Flow Calibration
08/20/2002:B1 Module Flow Calibration
08/20/2002:C1 Module Flow Calibration
08/20/2002:D1 Module Flow Calibration
08/20/2002:Photos taken
08/19/2004:A1 Module Flow Calibration
08/19/2004:B1 Module Flow Calibration
08/19/2004:C1 Module Flow Calibration
08/19/2004:D1 Module Flow Calibration
08/19/2004:Photos taken
08/17/2000:A1 Module Flow Calibration
08/17/2000:B1 Module Flow Calibration
08/17/2000:C1 Module Flow Calibration
08/17/2000:D1 Module Flow Calibration
08/15/2000:New IMPROVE site, version 2 sampler installed
07/29/2004:A1 Module electronics box replaced
07/14/2000:A1 Module Flow Calibration
07/14/2000:B1 Module Flow Calibration
07/14/2000:C1 Module Flow Calibration
07/14/2000:D1 Module Flow Calibration
07/14/2000:Photos taken
07/14/2000:Version 2 sampler installed
07/03/2001:offline until 08/17/2001
06/14/2004:Sampler controller replaced
05/30/2001:Sampler controller replaced
05/27/2004:Sampler controller replaced
05/02/2001:Sampler controller replaced
04/19/2001:Sampler controller replaced
03/25/2004:B1 Module pump replaced
03/14/2001:offline until 05/04/2001
03/12/2002:Ski lift ran on diesel engine today