Site Details |
| Country: | United States |
| State: | New Mexico (pop. 1515069) |
| County: | Rio Arriba County (pop. 34365) |
| Latitude: | 36.0139 |
| Longitude: | -106.8447 |
| Elevation: | 2935m above MSL |
| EPA Code: | 350399000 |
| Agency: | US Forest Service |
| Sponsor: | USFS |
| Region: | Colorado Plateau |
| Land Use: | Unknown |
| AQCR: | None |
| Dates: | 8/2000 - Present |
| SiteID: | 34 |
| SiteCode: | SAPE1 |
| SiteName: | San Pedro Parks |
| Maps: | Google, MSN, Yahoo |
Site History |
| 09/24/2003: | smoke from prescribed fires reduced visibility |
| 09/01/2003: | A1 Module Flow Calibration |
| 09/01/2003: | B1 Module Flow Calibration |
| 09/01/2003: | C1 Module Flow Calibration |
| 09/01/2003: | D1 Module Flow Calibration |
| 09/01/2003: | Photos taken |
| 09/01/2003: | Routine annual maintenance |
| 08/21/2001: | A1 Module Flow Calibration |
| 08/21/2001: | B1 Module Flow Calibration |
| 08/21/2001: | C1 Module Flow Calibration |
| 08/21/2001: | D1 Module Flow Calibration |
| 08/21/2001: | Photos taken |
| 08/21/2001: | Routine annual maintenance |
| 08/15/2000: | A1 Module Flow Calibration |
| 08/15/2000: | B1 Module Flow Calibration |
| 08/15/2000: | C1 Module Flow Calibration |
| 08/15/2000: | D1 Module Flow Calibration |
| 08/15/2000: | Version 2 sampler installed |
| 08/15/2000: | New IMPROVE site, version 2 sampler installed |
| 07/11/2003: | large fire in AZ have filled in the valleys with smoke |
| 06/02/2004: | A1 Module area increased from 2.20 to 3.53 sq cm |
| 05/22/2004: | A1 Module Flow Calibration |
| 05/22/2004: | B1 Module Flow Calibration |
| 05/22/2004: | C1 Module Flow Calibration |
| 05/22/2004: | D1 Module Flow Calibration |
| 05/22/2004: | Photos taken |
| 05/22/2004: | Routine annual maintenance |
| 04/26/2005: | Temperature probe replaced |
| 04/26/2005: | Sampler controller replaced |
| 04/15/2003: | High winds |
| 03/25/2002: | A1 Module Flow Calibration |
| 03/25/2002: | A1 Module pump replaced |
| 03/25/2002: | B1 Module Flow Calibration |
| 03/25/2002: | B1 Module pump replaced |
| 03/25/2002: | C1 Module Flow Calibration |
| 03/25/2002: | D1 Module Flow Calibration |
| 03/25/2002: | Photos taken |
| 03/25/2002: | Routine annual maintenance |
| 03/04/2003: | A1 Module pump replaced |