Lye Brook Wilderness (LYBR1)
Site Details
Country:United States
State:Vermont (pop. 562758)
County:Bennington County (pop. 35845)
Location2:Mount Equinox, at the windmills, Manchester, VT
Latitude:43.1482
Longitude:-73.1268
Elevation:1015m above MSL
EPA Code:500038001
Agency:US Forest Service
Sponsor:USFS
Region:Northeast
Land Use:Unknown
AQCR:None
Dates:9/1991 - Present
SiteID:3
SiteCode:LYBR1
SiteName:Lye Brook Wilderness
Maps:Google, MSN, Yahoo
Site History
11/16/2001:Sampler controller replaced
10/29/1998:A1 Module pump replaced
10/29/1998:B1 Module pump replaced
10/29/1998:C1 Module pump replaced
10/29/1998:D1 Module pump replaced
10/29/1998:replaced ET A1
10/26/2004:B1 Module pump replaced
10/19/1998:A1 Module Flow Calibration
10/19/1998:B1 Module Flow Calibration
10/19/1998:C1 Module Flow Calibration
10/19/1998:D1 Module Flow Calibration
10/19/1998:Routine annual maintenance
10/14/1997:A1 Module Flow Calibration
10/14/1997:B1 Module Flow Calibration
10/14/1997:C1 Module Flow Calibration
10/14/1997:D1 Module Flow Calibration
10/14/1997:Routine annual maintenance
10/13/1996:D1 Module Flow Calibration
10/01/2001:A1 Module Flow Calibration
10/01/2001:A1 Module replaced
10/01/2001:B1 Module Flow Calibration
10/01/2001:C1 Module Flow Calibration
10/01/2001:D1 Module Flow Calibration
10/01/2001:Photos taken
10/01/2001:Routine annual maintenance
09/21/2000:A1 Module Flow Calibration
09/21/2000:B1 Module Flow Calibration
09/21/2000:C1 Module Flow Calibration
09/18/2002:B1 Module Flow Calibration
09/18/2002:B1 Module pump replaced
09/18/2002:C1 Module Flow Calibration
09/18/2002:D1 Module Flow Calibration
09/18/2002:D1 Module relay box replaced
09/18/2002:Photos taken
09/18/2002:Routine annual maintenance
09/18/2002:A1 Module Flow Calibration
09/18/2002:A1 Module pump replaced
09/03/2003:C1 D1 Module electronics boxes swapped
09/01/2003:A1 Module Flow Calibration
09/01/2003:B1 Module Flow Calibration
09/01/2003:C1 Module Flow Calibration
09/01/2003:D1 Module Flow Calibration
09/01/2003:Photos taken
09/01/2003:Routine annual maintenance
08/27/2002:A1 Module elapsed timer replaced
08/25/1996:A1 Module Flow Calibration
08/25/1996:A1 Module pump replaced
08/25/1996:Added glycerin to Module B1 denuder
08/25/1996:B1 Module Flow Calibration
08/25/1996:C1 Module elapsed timer replaced
08/25/1996:C1 Module Flow Calibration
08/25/1996:D1 Module Flow Calibration
08/25/1996:Routine annual maintenance
08/21/1995:A1 Module Flow Calibration
08/21/1995:B1 Module Flow Calibration
08/21/1995:C1 Module Flow Calibration
08/21/1995:D1 Module Flow Calibration
08/21/1995:Routine annual maintenance
08/16/1994:A1 Module elapsed timer replaced
08/16/1994:A1 Module Flow Calibration
08/16/1994:A1 Module pump replaced
08/16/1994:B1 Module Flow Calibration
08/16/1994:B1 Module pump replaced
08/16/1994:C1 Module Flow Calibration
08/16/1994:C1 Module pump replaced
08/16/1994:D1 Module Flow Calibration
08/16/1994:D1 Module pump replaced
08/16/1994:Routine annual maintenance
08/05/2002:Sampler controller replaced
07/30/2001:Sampler controller replaced
07/23/2004:B1 Module pump replaced
06/28/1994:Changed nylon filter size from 47mm diameter to 25mm
05/25/2000:Version 2 IMPROVE sampler installed
05/25/2000:A1 Module Flow Calibration
05/25/2000:B1 Module Flow Calibration
05/25/2000:C1 Module Flow Calibration
05/25/2000:D1 Module Flow Calibration
05/25/2000:Version 2 sampler installed
04/26/1995:A1 Module area increased from 2.20 to 3.53 sq cm
02/03/1997:A1 Module pump replaced
02/03/1997:B1 Module pump replaced