Cohutta (COHU1)
Site Details
Country:United States
State:Georgia (pop. 6478216)
County:Whitfield County (pop. 72462)
Latitude:34.7852
Longitude:-84.6265
Elevation:735m above MSL
EPA Code:132139000
Agency:US Forest Service
Sponsor:USFS
Region:Appalachia
Land Use:Unknown
AQCR:None
Dates:5/2000 - Present
SiteID:12
SiteCode:COHU1
SiteName:Cohutta
Maps:Google, MSN, Yahoo
Site History
12/17/2002:Temperature probe replaced
12/07/2004:Sampler controller replaced
11/28/2000:24V power supply replaced
11/06/2004:A1 Module Flow Calibration
11/06/2004:B1 Module Flow Calibration
11/06/2004:C1 Module Flow Calibration
11/06/2004:D1 Module Flow Calibration
11/06/2004:D1 Module inlet Changed from Wedding to Sierra
11/03/2001:Site not running until 4/30/03
10/27/2000:Site not running until 12/2/00
09/13/2000:A1 Module Flow Calibration
09/13/2000:B1 Module Flow Calibration
09/13/2000:C1 Module Flow Calibration
09/13/2000:D1 Module Flow Calibration
09/13/2000:Photos Taken
09/13/2000:Routine annual maintenance
09/08/2002:A1 Module Flow Calibration
09/08/2002:A1 Module pump replaced
09/08/2002:B1 Module Flow Calibration
09/08/2002:B1 Module pump replaced
09/08/2002:C1 Module Flow Calibration
09/08/2002:D1 Module Flow Calibration
09/08/2002:Photos Taken
09/08/2002:Routine annual maintenance
08/22/2001:Sampler controller replaced
08/17/2001:Site not running until 10/4/01
08/13/2001:A1 Module Flow Calibration
08/13/2001:B1 Module Flow Calibration
08/13/2001:C1 Module Flow Calibration
08/13/2001:D1 Module Flow Calibration
08/13/2001:Photos Taken
08/13/2001:Routine annual maintenance
08/10/2004:D1 Module electronics box replaced
08/09/2000:Site not running until 09/12/00
07/27/2004:Sampler controller replaced
05/29/2001:Sampler controller replaced
05/28/2002:Replaced 12V power supply
05/24/2000:New IMPROVE site, version 2 sampler installed
05/23/2001:24V power supply replaced
05/23/2000:A1 Module Flow Calibration
05/23/2000:B1 Module Flow Calibration
05/23/2000:C1 Module Flow Calibration
05/23/2000:D1 Module Flow Calibration
05/23/2000:Version 2 sampler installed
05/21/2002:Sampler controller replaced
05/16/2003:A1 Module Flow Calibration
05/16/2003:B1 Module Flow Calibration
05/16/2003:C1 Module Flow Calibration
05/16/2003:C1 Module pump replaced
05/16/2003:D1 Module Flow Calibration
05/16/2003:D1 Module pump replaced
05/16/2003:Photos Taken
05/16/2003:Routine annual maintenance
05/16/2003:Sampler controller replaced
04/29/2003:A1 Module pump replaced
04/24/2001:24V power supply replaced
03/29/2001:Site not running until 6/6/01
03/28/2003:Site not running until 1/17/03