Shining Rock Wilderness (SHRO1)
Site Details
Country:United States
State:North Carolina (pop. 6628637)
County:Haywood County (pop. 46942)
Location2:Frying Pan Mountain, Skyline Drive, NC
Latitude:35.3937
Longitude:-82.7744
Elevation:1617m above MSL
EPA Code:370870035
Agency:US Forest Service
Sponsor:USFS
Region:Appalachia
Land Use:Unknown
AQCR:None
Dates:7/1994 - Present
SiteID:11
SiteCode:SHRO1
SiteName:Shining Rock Wilderness
Maps:Google, MSN, Yahoo
Site History
12/07/2004:Sampler controller replaced
11/15/2001:D1 Module offline until 03/06/2002
11/08/2004:B1 Module Flow Calibration
11/08/2004:C1 Module Flow Calibration
11/08/2004:D1 Module Flow Calibration
11/08/2004:Routine annual maintenance
11/08/2004:A1 Module Flow Calibration
10/04/1995:Hurricane Opal came thru Thursday morning
09/18/2001:Sampler controller replaced
09/12/2000:A1 Module Flow Calibration
09/12/2000:B1 Module Flow Calibration
09/12/2000:C1 Module Flow Calibration
09/12/2000:D1 Module Flow Calibration
09/09/2002:A1 Module Flow Calibration
09/09/2002:A1 Module pump replaced
09/09/2002:B1 Module Flow Calibration
09/09/2002:B1 Module pump replaced
09/09/2002:C1 Module Flow Calibration
09/09/2002:D1 Module Flow Calibration
09/09/2002:Photos taken
09/09/2002:Routine annual maintenance
09/04/1996:hurricane Fran blew by on Friday
09/01/1994:B1 Module Flow Calibration
08/15/1996:Added glycerin to Module B1 denuder
08/15/1996:B1 Module Flow Calibration
08/15/1996:B1 Module pump replaced
08/15/1996:C1 Module Flow Calibration
08/15/1996:C1 Module pump replaced
08/15/1996:D1 Module Flow Calibration
08/15/1996:D1 Module pump replaced
08/15/1996:Routine annual maintenance
08/15/1996:A1 Module Flow Calibration
08/15/1996:A1 Module pump replaced
08/11/2001:A1 Module Flow Calibration
08/11/2001:B1 Module Flow Calibration
08/11/2001:C1 Module Flow Calibration
08/11/2001:D1 Module Flow Calibration
08/11/2001:Photos taken
08/11/2001:Routine annual maintenance
08/02/1995:A1 Module Flow Calibration
08/02/1995:B1 Module Flow Calibration
08/02/1995:C1 Module Flow Calibration
08/02/1995:D1 Module Flow Calibration
08/02/1995:Routine annual maintenance
07/18/1994:A1 Module Flow Calibration
07/18/1994:B1 Module Flow Calibration
07/18/1994:C1 Module Flow Calibration
07/18/1994:D1 Module Flow Calibration
07/18/1994:Routine annual maintenance
07/16/2004:A1 Module electronics box replaced
07/16/2004:B1 Module electronics box replaced
07/16/2004:C1 Module electronics box replaced
07/16/2004:D1 Module electronics box replaced
07/14/2004:Sampler controller replaced
06/04/2003:D1 Module electronics box replaced
05/30/2000:Sampler controller replaced
05/22/1996:very bad storms last few days
05/15/2003:A1 Module Flow Calibration
05/15/2003:A1 Module relay box replaced
05/15/2003:B1 Module electronics box replaced
05/15/2003:B1 Module Flow Calibration
05/15/2003:C1 Module electronics box replaced
05/15/2003:C1 Module Flow Calibration
05/15/2003:C1 Module pump replaced
05/15/2003:D1 Module electronics box replaced
05/15/2003:D1 Module Flow Calibration
05/15/2003:Photos taken
05/15/2003:Routine annual maintenance
05/15/2003:Temperature probe replaced
05/12/2003:Sampler controller replaced
05/07/2002:D1 Module electronics box replaced
05/07/1997:Found pink mouse nest in A1 Module
04/29/2003:A1 Module relay box replaced
04/29/2003:Surge protector replaced
04/26/1995:A1 Module area increased from 2.20 to 3.53 sq cm
04/15/2003:Sampler controller replaced
04/15/2002:Sampler controller replaced
04/10/2002:12V and 24V power supplies replaced
04/04/2005:B1 Module electronics box replaced
04/02/2002:D1 Module offline until 09/11/2002
03/31/2005:Sampler controller replaced
03/30/2000:Version 2 IMPROVE sampler installed
03/30/2000:A1 Module Flow Calibration
03/30/2000:B1 Module Flow Calibration
03/30/2000:C1 Module Flow Calibration
03/30/2000:D1 Module Flow Calibration
03/30/2000:Photos taken
03/30/2000:Version 2 sampler installed
03/06/2003:Sampler controller replaced
03/01/1998:A1 Module pump replaced
03/01/1998:B1 Module pump replaced
03/01/1998:C1 Module pump replaced
03/01/1998:D1 Module pump replaced
03/01/1998:Sampler controller relay replaced
02/26/2003:Sampler controller replaced
02/19/2002:D1 Module pump replaced
02/16/1999:B1 Module pump replaced
01/18/1999:A1 Module Flow Calibration
01/18/1999:B1 Module Flow Calibration
01/18/1999:C1 Module Flow Calibration
01/18/1999:D1 Module Flow Calibration
01/18/1999:Routine annual maintenance
01/14/2003:D1 Module relay box replaced
01/14/1998:A1 Module Flow Calibration
01/14/1998:B1 Module Flow Calibration
01/14/1998:C1 Module Flow Calibration
01/14/1998:D1 Module Flow Calibration
01/14/1998:Routine annual maintenance