Site Details |
| Country: | United States |
| State: | North Carolina (pop. 6628637) |
| County: | Haywood County (pop. 46942) |
| Location2: | Frying Pan Mountain, Skyline Drive, NC |
| Latitude: | 35.3937 |
| Longitude: | -82.7744 |
| Elevation: | 1617m above MSL |
| EPA Code: | 370870035 |
| Agency: | US Forest Service |
| Sponsor: | USFS |
| Region: | Appalachia |
| Land Use: | Unknown |
| AQCR: | None |
| Dates: | 7/1994 - Present |
| SiteID: | 11 |
| SiteCode: | SHRO1 |
| SiteName: | Shining Rock Wilderness |
| Maps: | Google, MSN, Yahoo |
Site History |
| 12/07/2004: | Sampler controller replaced |
| 11/15/2001: | D1 Module offline until 03/06/2002 |
| 11/08/2004: | B1 Module Flow Calibration |
| 11/08/2004: | C1 Module Flow Calibration |
| 11/08/2004: | D1 Module Flow Calibration |
| 11/08/2004: | Routine annual maintenance |
| 11/08/2004: | A1 Module Flow Calibration |
| 10/04/1995: | Hurricane Opal came thru Thursday morning |
| 09/18/2001: | Sampler controller replaced |
| 09/12/2000: | A1 Module Flow Calibration |
| 09/12/2000: | B1 Module Flow Calibration |
| 09/12/2000: | C1 Module Flow Calibration |
| 09/12/2000: | D1 Module Flow Calibration |
| 09/09/2002: | A1 Module Flow Calibration |
| 09/09/2002: | A1 Module pump replaced |
| 09/09/2002: | B1 Module Flow Calibration |
| 09/09/2002: | B1 Module pump replaced |
| 09/09/2002: | C1 Module Flow Calibration |
| 09/09/2002: | D1 Module Flow Calibration |
| 09/09/2002: | Photos taken |
| 09/09/2002: | Routine annual maintenance |
| 09/04/1996: | hurricane Fran blew by on Friday |
| 09/01/1994: | B1 Module Flow Calibration |
| 08/15/1996: | Added glycerin to Module B1 denuder |
| 08/15/1996: | B1 Module Flow Calibration |
| 08/15/1996: | B1 Module pump replaced |
| 08/15/1996: | C1 Module Flow Calibration |
| 08/15/1996: | C1 Module pump replaced |
| 08/15/1996: | D1 Module Flow Calibration |
| 08/15/1996: | D1 Module pump replaced |
| 08/15/1996: | Routine annual maintenance |
| 08/15/1996: | A1 Module Flow Calibration |
| 08/15/1996: | A1 Module pump replaced |
| 08/11/2001: | A1 Module Flow Calibration |
| 08/11/2001: | B1 Module Flow Calibration |
| 08/11/2001: | C1 Module Flow Calibration |
| 08/11/2001: | D1 Module Flow Calibration |
| 08/11/2001: | Photos taken |
| 08/11/2001: | Routine annual maintenance |
| 08/02/1995: | A1 Module Flow Calibration |
| 08/02/1995: | B1 Module Flow Calibration |
| 08/02/1995: | C1 Module Flow Calibration |
| 08/02/1995: | D1 Module Flow Calibration |
| 08/02/1995: | Routine annual maintenance |
| 07/18/1994: | A1 Module Flow Calibration |
| 07/18/1994: | B1 Module Flow Calibration |
| 07/18/1994: | C1 Module Flow Calibration |
| 07/18/1994: | D1 Module Flow Calibration |
| 07/18/1994: | Routine annual maintenance |
| 07/16/2004: | A1 Module electronics box replaced |
| 07/16/2004: | B1 Module electronics box replaced |
| 07/16/2004: | C1 Module electronics box replaced |
| 07/16/2004: | D1 Module electronics box replaced |
| 07/14/2004: | Sampler controller replaced |
| 06/04/2003: | D1 Module electronics box replaced |
| 05/30/2000: | Sampler controller replaced |
| 05/22/1996: | very bad storms last few days |
| 05/15/2003: | A1 Module Flow Calibration |
| 05/15/2003: | A1 Module relay box replaced |
| 05/15/2003: | B1 Module electronics box replaced |
| 05/15/2003: | B1 Module Flow Calibration |
| 05/15/2003: | C1 Module electronics box replaced |
| 05/15/2003: | C1 Module Flow Calibration |
| 05/15/2003: | C1 Module pump replaced |
| 05/15/2003: | D1 Module electronics box replaced |
| 05/15/2003: | D1 Module Flow Calibration |
| 05/15/2003: | Photos taken |
| 05/15/2003: | Routine annual maintenance |
| 05/15/2003: | Temperature probe replaced |
| 05/12/2003: | Sampler controller replaced |
| 05/07/2002: | D1 Module electronics box replaced |
| 05/07/1997: | Found pink mouse nest in A1 Module |
| 04/29/2003: | A1 Module relay box replaced |
| 04/29/2003: | Surge protector replaced |
| 04/26/1995: | A1 Module area increased from 2.20 to 3.53 sq cm |
| 04/15/2003: | Sampler controller replaced |
| 04/15/2002: | Sampler controller replaced |
| 04/10/2002: | 12V and 24V power supplies replaced |
| 04/04/2005: | B1 Module electronics box replaced |
| 04/02/2002: | D1 Module offline until 09/11/2002 |
| 03/31/2005: | Sampler controller replaced |
| 03/30/2000: | Version 2 IMPROVE sampler installed |
| 03/30/2000: | A1 Module Flow Calibration |
| 03/30/2000: | B1 Module Flow Calibration |
| 03/30/2000: | C1 Module Flow Calibration |
| 03/30/2000: | D1 Module Flow Calibration |
| 03/30/2000: | Photos taken |
| 03/30/2000: | Version 2 sampler installed |
| 03/06/2003: | Sampler controller replaced |
| 03/01/1998: | A1 Module pump replaced |
| 03/01/1998: | B1 Module pump replaced |
| 03/01/1998: | C1 Module pump replaced |
| 03/01/1998: | D1 Module pump replaced |
| 03/01/1998: | Sampler controller relay replaced |
| 02/26/2003: | Sampler controller replaced |
| 02/19/2002: | D1 Module pump replaced |
| 02/16/1999: | B1 Module pump replaced |
| 01/18/1999: | A1 Module Flow Calibration |
| 01/18/1999: | B1 Module Flow Calibration |
| 01/18/1999: | C1 Module Flow Calibration |
| 01/18/1999: | D1 Module Flow Calibration |
| 01/18/1999: | Routine annual maintenance |
| 01/14/2003: | D1 Module relay box replaced |
| 01/14/1998: | A1 Module Flow Calibration |
| 01/14/1998: | B1 Module Flow Calibration |
| 01/14/1998: | C1 Module Flow Calibration |
| 01/14/1998: | D1 Module Flow Calibration |
| 01/14/1998: | Routine annual maintenance |