Great Smoky Mountains NP (GRSM1)
Site Details
Country:United States
State:Tennessee (pop. 4877185)
County:Sevier County (pop. 51043)
Location2:Look Rock, 8 mi S of Maryville, TN
Latitude:35.6334
Longitude:-83.9416
Elevation:810m above MSL
EPA Code:470090101
Agency:National Park Service
Sponsor:NPS
Region:Appalachia
Land Use:Unknown
AQCR:None
Dates:3/1988 - Present
SiteID:10
SiteCode:GRSM1
SiteName:Great Smoky Mountains NP
Maps:Google, MSN, Yahoo
Site History
12/22/2004:C1 Module pump replaced
12/07/2004:C1 Module pump replaced
12/07/2004:Sampler controller replaced
11/07/2004:A1 Module Flow Calibration
11/07/2004:B1 Module Flow Calibration
11/07/2004:C1 Module Flow Calibration
11/07/2004:D1 Module Flow Calibration
11/07/2004:Routine annual maintenance
09/13/2000:A1 Module Flow Calibration
09/13/2000:B1 Module Flow Calibration
09/13/2000:C1 Module Flow Calibration
09/13/2000:D1 Module Flow Calibration
09/13/2000:Photos Taken
09/13/2000:Routine annual maintenance
09/08/2002:A1 Module Flow Calibration
09/08/2002:A1 Module pump replaced
09/08/2002:B1 Module Flow Calibration
09/08/2002:B1 Module pump replaced
09/08/2002:C1 Module Flow Calibration
09/08/2002:D1 Module Flow Calibration
09/08/2002:Photos Taken
09/08/2002:Routine annual maintenance
08/30/1994:A1 Module Flow Calibration
08/30/1994:B1 Module Flow Calibration
08/30/1994:C1 Module Flow Calibration
08/30/1994:D1 Module Flow Calibration
08/30/1994:Routine annual maintenance
08/16/1996:A1 Module Flow Calibration
08/16/1996:Added glycerin to Module B1 denuder
08/16/1996:B1 Module Flow Calibration
08/16/1996:C1 Module Flow Calibration
08/16/1996:D1 Module Flow Calibration
08/16/1996:Routine annual maintenance
08/12/2001:A1 Module Flow Calibration
08/12/2001:B1 Module Flow Calibration
08/12/2001:C1 Module Flow Calibration
08/12/2001:D1 Module Flow Calibration
08/12/2001:Photos Taken
08/12/2001:Routine annual maintenance
08/12/1997:C1 Module Flow Calibration
07/24/1994:A1 Module Flow Calibration
07/24/1994:B1 Module Flow Calibration
07/24/1994:C1 Module Flow Calibration
07/24/1994:D1 Module Flow Calibration
07/24/1994:Routine annual maintenance
07/23/2003:D1 Module pump replaced
07/23/2003:Sampler controller replaced
07/20/2000:Sampler controller replaced
07/19/1992:Moved Inside
07/19/1992:GRSM1 moved from outside to inside a shelter
07/16/1995:A1 Module Flow Calibration
07/16/1995:A1 Module pump replaced
07/16/1995:B1 Module Flow Calibration
07/16/1995:B1 Module pump replaced
07/16/1995:C1 Module Flow Calibration
07/16/1995:C1 Module pump replaced
07/16/1995:D1 Module Flow Calibration
07/16/1995:D1 Module pump replaced
07/16/1995:Routine annual maintenance
07/01/1998:D1 Module Flow Calibration
06/28/1994:Changed nylon filter size from 47mm diameter to 25mm
06/01/1997:NH4+ species taken by IC off the nylon filter. The nylon filter extraction used deionized water as opposed to the sodium carbonate/sodium bicarbonate solution normally used.
05/29/1997:A1 Module Flow Calibration
05/29/1997:B1 Module Flow Calibration
05/29/1997:C1 Module Flow Calibration
05/29/1997:D1 Module Flow Calibration
05/29/1997:Routine annual maintenance
05/21/2003:D1 Module electronics box replaced
05/13/2003:A1 Module Flow Calibration
05/13/2003:B1 Module Flow Calibration
05/13/2003:C1 Module Flow Calibration
05/13/2003:C1 Module pump replaced
05/13/2003:D1 Module Flow Calibration
05/13/2003:GRSM9 PM10 Installed
05/13/2003:Photos Taken
05/13/2003:Routine annual maintenance
05/13/1999:Made changes to GRSM1 MT values from 7/1/98 to 8/31/98 due to recalibration of the sampler.
05/13/1999:Made changes to GRSM1 SO2 values from 7/1/98 to 8/31/98 due to recalibration of the sampler.
05/10/2004:A1 Module relay box replaced
05/06/1997:D1 Module Flow Calibration
04/22/2005:Sampler removed collocated PM10
04/19/1995:A1 Module area increased from 2.20 to 3.53 sq cm
03/28/2000:Version 2 IMPROVE sampler installed
03/28/2000:A1 Module Flow Calibration
03/28/2000:B1 Module Flow Calibration
03/28/2000:C1 Module Flow Calibration
03/28/2000:D1 Module Flow Calibration
03/28/2000:Version 2 sampler installed
03/20/1997:Sampler moved to new shelter
03/20/1997:GRSM1 moved into a new shelter.
03/08/2005:A1 Module relay box replaced
03/08/2005:D1 Module relay box replaced
03/08/2005:Sampler controller replaced
03/08/2005:Temperature probe replaced
01/16/1998:A1 Module Flow Calibration
01/16/1998:B1 Module Flow Calibration
01/16/1998:C1 Module Flow Calibration
01/16/1998:D1 Module Flow Calibration
01/16/1998:Routine annual maintenance
01/15/1999:A1 Module Flow Calibration
01/15/1999:B1 Module Flow Calibration
01/15/1999:C1 Module Flow Calibration
01/15/1999:D1 Module Flow Calibration
01/15/1999:Routine annual maintenance